Question

Problem 6 - The figure 2 shows a design vehicle stopped on a minor road at a major road intersection The design speed of the
0 0
Add a comment Improve this question Transcribed image text
Answer #1

PROBLEM 6

The answer is shown in below by hand written notes :

Problem - 6 Given Design Answer data; speed of major road = 60 mph Vnajour] Minor rol Major Rolo LIT The design intersectionwhere, Vonino - Design speed of major road vehicle in mph. Time har gap for for minor road vehicle to enter the major road inthe give problem having 5 lanes, Additional time gap for passenger car xo.5 = 2-5 s Additional time gap for trucks = 5x 0. 7b) tg. for single unit truck ISO = 1-47 Vmajor = 1.47 x 60x 1058.4 12 m truck c) for combination Iso= 1.47 Imajor - tg. - 1-4

Add a comment
Know the answer?
Add Answer to:
Problem 6 - The figure 2 shows a design vehicle stopped on a minor road at...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • please, make your writing readable Intersection Sight Distance A developer has requested permission to build a large ret...

    please, make your writing readable Intersection Sight Distance A developer has requested permission to build a large retail store at a location adjacent to the intersection of a divided four-lane major road and a two-lane minor road. Traffic on the minor road is controlled by a stop sign. The speed limits are 35mph and 50mph on the minor and major roads, respectively. The building is to be located at a distance of 65ft from the near lane of one of...

  • Question 1 What are objectives of intersection design? A two-lane minor road with + 1% approach...

    Question 1 What are objectives of intersection design? A two-lane minor road with + 1% approach grade in the North-South direction intersects a two- lane major road in the East-West direction that has a speed limit of 60mph, a +4% approach grade torming a four-leg intersection. A building is located in the South-east corner of the intersection such that the distance from the centerline of the nearest lane on the minor road to the building is 50 major road is...

  • 2) A 6-lane divided highway has a design speed of 65 mph and the following typical...

    2) A 6-lane divided highway has a design speed of 65 mph and the following typical section: Grassed median: Median shoulders: Lanes: Right-side shoulders: 14 ft. wide 4ft. wide 12 ft. wide, 3 lanes directional 10 ft. wide Centerline Degree of Curvature, D is 3 45 If single face concrete barrier be installed along the highway without encroaching on the required horizontal sight distance, how far (at minimum) from the roadway centerline should the face of the barrier be located?

  • 2) A 6-lane divided highway has a design speed of 65 mph and the following typical...

    2) A 6-lane divided highway has a design speed of 65 mph and the following typical section: Grassed median: Median shoulders: Lanes: Right-side shoulders: Centerline Degree of Curvature, D is 3 45 14 ft. wide 4ft. wide 12 ft. wide, 3 lanes directional 10 ft. wide If single face concrete barrier be installed along the highway without encroaching on the required horizontal sight distance, how far (at minimum) from the roadway centerline should the face of the barrier be located?

  • 1. According to the paper, what does lactate dehydrogenase (LDH) do and what does it allow...

    1. According to the paper, what does lactate dehydrogenase (LDH) do and what does it allow to happen within the myofiber? (5 points) 2. According to the paper, what is the major disadvantage of relying on glycolysis during high-intensity exercise? (5 points) 3. Using Figure 1 in the paper, briefly describe the different sources of ATP production at 50% versus 90% AND explain whether you believe this depiction of ATP production applies to a Type IIX myofiber in a human....

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT