Question

Problem 4. A horizontal curve is being designed through mountainous terrain for a four-lane road with lanes that are 10 ft wi
0 0
Add a comment Improve this question Transcribed image text
Answer #1

NA . Civen, central angle A=40° Tungent distance - 51004 PT TV Pe ....here, Tive Tz Va 510 H = 155.448m.: chainage of point V= 2700 700 :? La Radius of the curre : Tive R Tan (4) i » 510.=. R. Ta.PC = 265238.037 978.229 PC = 266 216.259 st . - - For cuve a s for Min radius of cowe @ design speed = 6omph = 88 ft/sec sup

Add a comment
Know the answer?
Add Answer to:
Problem 4. A horizontal curve is being designed through mountainous terrain for a four-lane road with...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A horizontal curve is designed for a two-lane road in mountainous terrain. The following data is...

    A horizontal curve is designed for a two-lane road in mountainous terrain. The following data is known: Deflection angle: 40 degrees Tangent length: 436.76 feet Station of PI: 2700 10.65 fs = 0.12 e 0.08 Determine the following (a) Design speed= 60 mph (b) Station of the PC 2695+73.89 (c) Station of the PT = 2704+11.64 (d) draw the superelevation attainment detail drawing, show all important stations and lengths. wwwwnO Just Solve part (d) A horizontal curve is designed for...

  • A developer is having a single-lane raceway constructed with a 120 mph design speed. A curve on the raceway has a radius of 1200 ft, a central angle of 30 degrees, and PI stationing at 1125+10. I...

    A developer is having a single-lane raceway constructed with a 120 mph design speed. A curve on the raceway has a radius of 1200 ft, a central angle of 30 degrees, and PI stationing at 1125+10. If the design coefficient of side friction is 0.20, determine the superelevation required at design speed (do not ignore the normal component of the centripetal force). Also, compute the degree of curve, length of curve, and stationing of the PC and PT. 4. A...

  • 2. A simple circular curve on a rural roadway is designed with a radius of 1500...

    2. A simple circular curve on a rural roadway is designed with a radius of 1500 ft and a design speed of 55 mph. No spiral transition curve is to be used. The emax standard is 10%. The road has one lane per direction with 12-ft lanes and a 1% normal crown. (1.5 pts) a. Determine the design superelevation value (ed) and the corresponding lengths of superelevaion runoff (Lr) and tangent runout (Lt) (1.5 pts) b. Do a free-hand elevation...

  • (2 points) A horizontal curve on a two-lane highway (12-ft lanes) is designed for 55 mi/h...

    (2 points) A horizontal curve on a two-lane highway (12-ft lanes) is designed for 55 mi/h with a 6% superelevation. The central angle of the curve is 50 degrees and the PI is at station 212+67. What is the station of the PT? Determine the length of superelevation runoff and tangent runout for the associated curve transition section (assume a normal, 2% crown). Assume perception-reaction time of 2.5 sec and the deceleration rate for braking (a) is 11.2 ft/sec2

  • 6:47 1 4 Search <Back Hw#3-2019.doc 15- 10. A horizontal curve is designed for a two-lane...

    6:47 1 4 Search <Back Hw#3-2019.doc 15- 10. A horizontal curve is designed for a two-lane road in mountainous terrain. The following data are known. Intersection angle: 40 degrees Tangent length: 436.76 feet Station of Pl: 2700+10.65 fs- 0.12 e- 0.08 Determine the following. (a) Design speed (b) Station of the PC (c) Station of the PT (d) Deflection angle and chord length to the first even 100 ft station. 15-11. A proposed highway has two tangents of bearings N...

  • Part A. The following information is for a proposed horizontal curve in a new subdivision: PI...

    Part A. The following information is for a proposed horizontal curve in a new subdivision: PI Station: 12+40.00 R-572.96 feet Deflection angle A-12.30 What is the Station of PT? PI PC PT Part B. An existing highway has a historic site located at the PT of an existing curve with a PI located at Station 80+00, an extemal angle of 65°, and a radius of 1,200 ft. The curve must be relocated, moving the PI to Station 78+00. The external...

  • Determine the SSD for this curve. Calculate the radius of the curve, the length, and stations for PC and PT 3.39 On a r...

    Determine the SSD for this curve. Calculate the radius of the curve, the length, and stations for PC and PT 3.39 On a roadway with two 12-ft lanes, a horizontal curve is designed for 35 mi/h with a 4% superelevation. It is known that Δ-20, The PI of the curve is at station 30 + 00. What is the station of the PT of the curve? 3.39 On a roadway with two 12-ft lanes, a horizontal curve is designed for...

  • A 5 degree curve (measured at the centerline of the inside lane) is being designed for...

    A 5 degree curve (measured at the centerline of the inside lane) is being designed for a highway with a design speed of 60 mph. What is the closest any roadside object may be placed to the centerline of the inside lane of the roadway while maintaining adequate stopping sight distance? Assume lane widths are 12 feet. 3) A 520-ft long equal tangent crest vertical curve connects tangents that intersect at station 340+00 and elevation 1325 ft. The initial grade...

  • 5. For a horizontal curve, A=82'30', the station of the PC is 6+14.00, and terrain conditions...

    5. For a horizontal curve, A=82'30', the station of the PC is 6+14.00, and terrain conditions require the minimum radius permitted by the specifications of, 100 ft. (are definition). Calculate (15 points): a. The stationing of PI and PT, and the external (E) and middle ordinate distances (M) and chord length (LC) for this curve. b. Compute sub-deflection angles and sub-chords to stake out this curve. Use quarter-stations 1251 (Note: In the example we solved together in class, we used...

  • 2. A horizontal curve on a 4 lane highway has a super elevation of 6% and...

    2. A horizontal curve on a 4 lane highway has a super elevation of 6% and a central angle of 40 degrees. The PT of the curve is at station 322+50 and PI is at 320+08. The road has 10 feet lanes, 2 lanes in each direction, no median, and 8 feet shoulders on both sides. What is the highest safe speed (round to 5mi/hr increments) and what is the station for PC?

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT