Constraint time from previous task: 492 hours, there is no longer constraint time.
How many sofas of each model should Harvey Furniture produce to maximise profits each week?
a) Number of units of Standard model to be produced?
b) Number of units of Premium model to be produced?
Standard model | Premium model | |
Selling price per unit | $200 | $320 |
Variable cost per unit | -$179 | -$290 |
Contribution margin per unit | $21 | $30 |
Labor hour per unit | 3 | 5 |
Contribution margin per labor hour | 21/3 = $7 | 30/5 = $6 |
Since Contribution margin per labor hour is higher for standard model, hence standard model should be produced to the maximum.
Total direct labor hour available = 492
Maximum demand of standard model = 100 units
Direct labor hour used in making standard model = Maximum demand of standard model x Direct labor hour per unit for standard model
= 100 x 3
= 300
Remaining direct labor hour = Total direct labor hour available - Direct labor hour used in making standard model
= 492 - 300
= 192
Production of premium model = Remaining direct labor hour /Direct labor hour per unit of premium model
= 192/5
= 38 units
a. Number of units of standard model = 100
b. Number of units of premium model = 38
kindly give a positive rating if you are satisfied with the solution. Do comment if you have any query, Thanks.
Constraint time from previous task: 492 hours, there is no longer constraint time. How many sofas...
Kinnane's Fine Furniture manufactures two models, Standard and Premium. Weekly demand is estimated to be 104 units of the Standard Model and 71 units of the Premium Model. The following per unit data apply: Standard $21 Premium $30 Contribution margin per unit Number of machine - hours required The contribution per machine -hour is O A. $147 for Standard, $150 for Premium O B. $21 for Standard, $30 for Premium O C. $3 for Standard, $6 for Premium OD. $14...
Problem 3-12 (Algorithmic) uality Air Conditioning manufactures three home air conditioners: an economy mode a standard model and a deluxe mo e The profits per nit are S,, 4 , and respectively. The production requirements per unit are as follows: Number of Number of Manufacturing Cooling Coils Time (hours) Fans Economy 8 Standard 12 Deluxe 4 14 For the coming production period, the company has 320 fan motors, 380 cooling coils, and 3200 hours of manufacturing time available. How many...
Please open the attachment and enlarge to view Options are Highest or lowest two or four or five only one deluxe or only the deluxe model or two times as many deluxe model as regular models or two times as many regular models as deluxe models ExerLight produces two types of exercise treadmills: Regular and Deluxe. The exercise craze is such that ExerLight could use all of its available machine hours producing either model. The two models are processed through...
Tra c es tipes of Regular and was the c a se and related demand is such could use of machine hos producing model Them es are through the same production department Potepinis Data Teadlight Product Me Analysis TreadLight Product Mix Analysis Deluxe Regular Contribution margin for equivalent number of direct labor hours Contribution margin for equivalent number of machine hours Contribution margin per unit Fixed costs per unit Sale price per unit Units produced with equivalent number of direct...
Problem 3-12 (Algorithmic) Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $67, $93, and $129, respectively. The production requirements per unit are as follows: Number of Manufacturing Number of Cooling Coils Time (hours) Fans Economy Standard 12 Deluxe 14 For the coming production period, the company has 250 fan motors, 360 cooling coils, and 1800 hours of manufacturing time available. How many economy models (E),...
12. a-d and 13. a-d 12. Quality Air Conditioning manufactures three home air conditioners: an cconomy model a standard model, and a deluxe model. The profits per unit are S63-995, and $135, np tively. The production requirements per unit are as follows Number of Fans Number of Cooling Cods Manufacturing Time hours Standard Deluxe 12 14 For the coming production period, the company has 200 fan motons, 320 cooling coils and 2400 hours of manufacturing time available. How many ecconomy...
Problem 3-12 (Algorithmic) Quality Air Conditioning manufactures three home air conditioners: an economy model, a standard model, and a deluxe model. The profits per unit are $69, 91, and $127, respectively. The production requirements per unit are as follows: Number ofNumber of Manufacturing Fans Cooling Coils Time (hours) Economy 8 Standard 12 Deluxe 14 4 For the coming production period, the company has 200 fan motors, 340 cooling coils, and 2800 hours of manufacturing time available. How many economy models...
Question 2 Way Cool produces two different models of air conditioners. The company produces the mechanical systems in its components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow. (Loss amounts should be indicated with a minus sign. Round your intermediate calculations and round "Cost per unit and OH rate" answers to 2 decimal places.) Process Activity Components...
Exercise 17-8 Using departmental overhead rates to assess prices LO P2 Way Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow Process Activity Overhead Coss Driver Quantity Components Changeover $ 458,000 Number of batches Machining 910,000 Machine hou Setups 226,000 aber...
Use the scenario given below to answer the following question(s) Ray Inc. manufactures two types of gaming consoles, the sp2 hybrid and the sp3 hybrid models. The manufacturing process consists of two principal departments: design and production. The design department has 58 skilled workers, each of whom works 7 hours per day. The production department has 25 workers, who also work a 7-hour shift. On an average, to produce a sp2 hybrid, Ray Inc. requires 3.5 labor hours for design...