activity | Number of steps | Time | Dist ft |
operations | 7 | 19.1 | |
Transport | 6 | 16.7 | 205 |
Inspect | 3 | 10.2 | |
Dely | 2 | 10.2 | |
Store | 0 | 0 |
Step | Time | Output |
1 | 2.5 | 24 |
2 | 2 | 30 |
3 | 1.2 | 50 |
4 | 3 | 20 |
5 | 5.2 | 11.53846 |
6 | 2 | 30 |
7 | 1.5 | 40 |
8 | 5 | 12 |
9 | 2.5 | 24 |
10 | 2 | 30 |
11 | 5 | 12 |
12 | 1.4 | 42.85714 |
13 | 2 | 30 |
14 | 5.2 | 11.53846 |
15 | 1.4 | 42.85714 |
16 | 5.5 | 10.90909 |
17 | 3.5 | 17.14286 |
80 | 5.3 | 11.32075 |
Bottleneck is step 16 with output 10.9.
c. Yearly process cost = 15x25x350x18 = 2362500
Number of outputs = 10.9 x18x350 = 68670
labour cost per output = 34.4
d. Delay time of 10.2 hours which is due to waiting can be reduced by effective scheduling.
Transportation can be minimised by using proper layout strategy. It will also reduce time and thus outputs.
By reducing finish time, carrying time of unit and other time values which are more than 5 min per step can increase the output significantly
Problem 3. The figure below shows a typical process chart. a. Complete the summary (top right)...