I've considered average precipitation of rainfall for 30mis is 1" = 0.083 ft
total area of watershed = 871200 sq ft
area of pavements and roof = 871200 * 0.15
=130680 sft
rest of area(woodland and forest) = 871200-130680
=740520
(note -1)At pavements ( at pavements runoff will be 100%)
2) at grasslands or forest runoff will be 60%) )
runoff = precipitation of rainfall x area x runoff percentage
Total runoff = runoff at rooftops and pavements + runoff at forest
=0.083 * 130680 * 1 + 0.083 *740520 * 0.6
=10846.44 + 36877.8
=477254.24 cubic feet
NOTE-
I've considered intensity of rainfall for 30min is 1"
Example: Estimate the runoff generated by a 50 yr rainstorm that lasts 30 minutes in watershed...