In a project for which a section of the mass haul diagram is shown in the lower figure, the free haul distance is specified as 100 m. Calculate the cost of earh moving in the sectice between chainages 100 m and 400 m if the charge for moving material within the free haul distance is 5 JD per m3 and for moving any overhaul s 10 ID per㎡ m. The aus should be taken as the balancing line and the...
On the following Mass-haul diagram, what is the overall total cut or fill? Cumulative Volume (cubic yds) 500 1000 1500 2000 2500 3000 3500 4000 Station (ft)
In a project for which a section of the mass haul diagram is shown in the lower figure, the free haul distance is specified as 100 m. Calculate the cost of earh moving in the sectice between chainages 100 m and 400 m if the charge for moving material within the free haul distance is 5 JD per m3 and for moving any overhaul s 10 ID per㎡ m. The aus should be taken as the balancing line and the...
Complete the precedence diagram
Label ESİ Dur Set Cut Pa Haul Off Debris
Ready Ride is a trucking company. It provides local, short-haul, and long-haul services. It has developed the following three cost pools. Estimated Overhead Expected Use of Cost Driver r Activit Activity Cost Pool Cost Drivers Loading and unloading Travel Number of pieces Miles driven Hours $100,000 467,000 73,000 92,300 575,000 2,850 Logistics Compute the activity-based overhead rates for each pool. (Round answers to 2 decimal places, e.g. 12.75.) Activity-Based Activity Cost Pooloverhead Rate Loading and unloading s Travel Logistics per...
Ready Ride is a trucking company. It provides local,
short-haul, and long-haul services. It has developed the following
three cost pools.
Activity Cost Pool
Cost Drivers
Estimated
Overhead
Expected Use of
Cost Driver
per Activity
Loading and unloading
Number of pieces
$92,000
89,300
Travel
Miles driven
437,000
583,000
Logistics
Hours
80,000
2,830
Compute the activity-based overhead rates for each pool.
(Round answers to 2 decimal places, e.g.
12.75.)
Activity Cost Pool
Activity-Based
Overhead Rate
Loading and unloading
$
per piece...
Ready Ride is a trucking company. It provides local,
short-haul, and long-haul services. It has developed the following
three cost pools.
Activity Cost Pool
Cost Drivers
Estimated
Overhead
Expected Use of
Cost Driver
per Activity
Loading and unloading
Number of pieces
$95,000
91,300
Travel
Miles driven
439,000
621,000
Logistics
Hours
63,000
2,890
Compute the activity-based overhead rates for each pool.
(Round answers to 2 decimal places, e.g.
12.75.)
Activity Cost Pool
Activity-Based
Overhead Rate
Loading and unloading
$
per piece...
Ready Ride is a trucking company. It provides local, short-haul, and long-haul services. It has developed the following three cost pools. Activity Cost Pool Cost Drivers Estimated Overhead Expected Use of Cost Driver per Activity Loading and unloading Number of pieces $ 91,000 89,500 Travel Miles driven 457,000 579,000 Logistics Hours 75,000 2,810 Compute the activity-based overhead rates for each pool. (Round answers to 2 decimal places, e.g. 12.75.) Activity Cost Pool Activity-Based Overhead Rate Loading and unloading $ per...