Project Mangement
d. Draw a Work Breakdown Structure (WBS) for the Following scenario of Building/Assembling a...
d. Draw a Work Breakdown Structure (WBS) for the Following scenario of Building/Assembling a Toy Bus to be shipped in a Case. (30 Marks) Wheel consists of Plastic Powder and Plastic dye-black. A wheel/axle consists of a Wheel and an Axle. The Body of the Bus consists of Plastic dye-blue and Plastic powder. The Toy Bus Consists of the Body and the Wheel/Axle. The Toy Bus package consists of the Bus box and the toy bus, The Toy Bus to be shipped in a Case consists of the Casc Label, the Toy bus package and the packaging case.