subject: project delivery systems .explain about engineering procurement & construction method
Engineering procurement and construction method is the method in which the project is designed and worked according to the needs of the client by the collaborative teamwork of an engineer and construction managerThe construction manager and engineer work on prucuring the materials required for the project. This method is used in construction projects. Planning a detailed design of the project, procuring the material and equipment and as per the requirement and carying out the construction process as per needs of the clients is the process that the construction manager and engineer takes up together under this method. It is also called the execution phase as it takes care of the execution of the project succesfully. Using this method in a construction project helps in delivery of sustainable and efficient results which will be cost efficient and time saving and help in overall project success.
subject: project delivery systems .explain about engineering procurement & construction method
What are the systems engineering process and approach that will be applied to the construction of a University project? Discuss the development or life cycle of that system using Systems Engineering principles.
Briefly describe the types of ventilation systems My subject is Plant Engineering
please define what are the specifications? subject: Laws and contracts for construction( construction project management)
outline and explain high level process steps for conducting project procurement
An engineering project manager is preparing a preliminary cost estimate for a design and construction wants to use the ENR construction cost index to update the cost. If the index value in 2014 in 9,417, estimate the cost of construction for a similar-size project in 2014 Do NOT (ype the dollar sign $') or any commas .) in your answer Round to two decimals (money maage s prepa ng a preimn y cost estimate for a design and construct pr...
7 In the work breakdown structure for a construction project: A. The different levels of detail represents the logical hierarchical decomposition of the B. The smallest element in the WBS is the activity C. The project elements at various levels of the WBS relate to the contractor's project organizational structure, which defines the different responsibility levels D. All the above Negotiated cost-plus type of contracts is best used when: A. The risk is high B. No variations are expected C....
Explain what integrated delivery systems are, and provide some examples?
Show and explain a typical chilled water central air conditioning system My subject is Plant Engineering
SUBJECT: SOFTWARE ENGINEERING 2. In regards to UML class diagrams, explain the difference between aggregation, association, and composition.
What is knowledge engineering? Explain the difference between shallow knowledge and deep knowledge, and rule-based systems and model-based systems respectively.