Assignment, due on Thursday Feb 1st 2018 n an underground mine, a 65 meters long conveyor...
Assignment, due on Thursday Feb 1st 2018 n an underground mine, a 65 meters long conveyor belt is used to carry 100 Metric Ton per hour of crushed ore. The linear velocity of the conveyor belt is 1.4 m/s and it is installed with 9° inclination 1) Neglecting the velocity of the crushed ore just before it reaches the conveyor, calculate the mechanical power that the conveyor needs to operate. (hint; assume that mechanical power is needed to increase the kinetic energy and the potential energy of the crushed ore) Crushed ore 1.4 m/s L=65 m 2) The conveyor is mounted on a wheel with 0.4m diameter. A gear, with larger wheel diameter of 0.25 m and smaller wheel diameter of 0.032m, is used to transmit torque from an AC motor to the wheel. Calculate the torque and RPM of the AC motor. 21