Question one proposed roadway by the rise and fall method in the table below. . On the table, calculate the surface reduced l

Area engineering

0 0
Add a comment Improve this question Transcribed image text
Answer #1

12,56 IN 2.4 eduie 77,150 9,050 7.2.546 | 구2.300 76,616,60 し110 S0 4,2c0

Add a comment
Know the answer?
Add Answer to:
Area engineering Question one proposed roadway by the rise and fall method in the table below....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Fill in the unknown levelling data in the table below. Station BS IS FS Rise Fall...

    Fill in the unknown levelling data in the table below. Station BS IS FS Rise Fall RL Remarks 1 3.892 22.75 BM1 2 2.524 1.368 24.118 CH1 3 А. B. C CH2 4 D 0.304 25.669 CH3 5 2.281 1.308 24.361 CP 6 4.516 3.516 20.845 CH5 7 2.201 E 23.16 CH6 8 F G Н. 24.115 CP 9 5.784 J K 27.235 CH8 10 1.246 4.538 L CHO 11 M N 30.458 CH10 11 M N 30.458 CH10 12....

  • please i need help asap , i need the full answers , i want to study...

    please i need help asap , i need the full answers , i want to study it back soon QUESTION 3 a) With the aid of diagrams, describe four (4) errors in leveling. (C01, PO1) (C3) (8 marks) b) Table Q3(b) shows extracted data of leveling work from Bench Mark (BM) 3/24 to Bench Mark 5/25, located at one construction site. Reduced level of BM 3/24 is 44.244 m, BM 5/25 is 43.446 m above Mean Sea Level, and interval...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT