Question

(5 mark) C/ Estimate the total sludge production from waste water treatment plant to treat 1000 mº/day with influent BOD of 2

Sanitary & environment engineering

0 0
Add a comment Improve this question Transcribed image text
Answer #1

at 1000 X 1000 1000 m² I day 210 ongle 2108 106 21x10? 210 kg ss - =) total waste water treatment plant to treat is /day infl

Add a comment
Know the answer?
Add Answer to:
Sanitary & environment engineering (5 mark) C/ Estimate the total sludge production from waste water treatment...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A sewage treatment plant treats sewage at average flowrate of 10000m3/day. The plant applies activated sludge...

    A sewage treatment plant treats sewage at average flowrate of 10000m3/day. The plant applies activated sludge process for biological treatment. Find; 1. Volume of aeration tank. 2. Design air requirement. 3. Flowrate of waste sludge. Use the following data;  BOD of raw sewage=250mg/l.  Percent of BOD removal in primary sedimentation tank =32%.  MLVSS=2400 mg/l.  MLVSS in return sludge=10000mg/l.  Y=0.6 and kd=0.06/day.  Effluent BOD=20mg/l.  Effluent SS=30mg/l.

  • A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process...

    A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process followed by conventional activated sludge process composed of covered aeration tanks and secondary clarifiers. You are asked to calculate the different operation parameters to make sure that the system is operated within normal process ranges listed in the reference tables below. Table 5-20 Typical design information for primary sedimentation tanks U.S. customary units Item Unit Range Typical Primary sedimentation tanks followed by secondary treatment...

  • Q4:Design rectangular primary sedimentation tank to remove 30% of BOD from the total an equivalent load...

    Q4:Design rectangular primary sedimentation tank to remove 30% of BOD from the total an equivalent load of influent BOD and SS=700kg/day when the maximum expected flow is 8000m2/day and the detention time is 2.5hr .(take L:W=3:1). Then estimate: 1-The quantity of the sludge that is removed in an efficiency of 60% (assume moisture content of sludge =90%) 2-The effluent concentration of BOD and SS.

  • Environmental Engineering 3&4 So 3. An activated sludge plant treats 5 MGD and the average influent...

    Environmental Engineering 3&4 So 3. An activated sludge plant treats 5 MGD and the average influent BOD is 200 mg/L. The WWTP has 2 aeration basins, each 100 ft x 25 ft x 15 ft deep and 2 final clarifiers with diameters of 20 ft. About 35% of BOD is removed in primary clarifiers. Determine the BOD in the primary effluent, hydraulic retention time, F/M ratio, BOD exiting the aeration basin and mass of solids wasted (1b/d). The operation parameters...

  • You are assigned to operate a drinking water treatment plant which has a capacity of 280...

    You are assigned to operate a drinking water treatment plant which has a capacity of 280 ML per day. The source water is from a river that contains a high concentration of dissolved organic carbon (DOC), (13 mg L-1) and has a high colour (60 HU) but where the alkalinity changes seasonally. In summer to winter the alkalinity is high (> 100 mg L-1 as CaCO3) and in spring after snow has melted in the mountains and the water flows...

  • Situation (note: Problem 2 is not linked with Problem 1): Assuming the design flow rate of...

    Situation (note: Problem 2 is not linked with Problem 1): Assuming the design flow rate of raw wastewater to be treated is 20 MGD in the design year, the dissolved BODs is 380 mg/L, and SS is 360 mg/L. The wastewater generated by the sludge treatment process is about 4 MGD with the dissolved BODs being 1800 mg/L, and SS being 1200 mg/L, and will be returned to the wet well in the pumping station at the beginning of the...

  • reply ma as soon as possible 120 points total Due: October 23, 2019 Budget your time...

    reply ma as soon as possible 120 points total Due: October 23, 2019 Budget your time carefully TRUE OR FALSE (45 points - 3 points cach): Mark whether the statements as written are "true" or "false". If the statement is false, make minor changes to the statement so that the statement is true. The primary adverse health effect resulting from the disposal of mercury wastes into Minamata Bay was dysentery The flow regime in horizontal velocity grit chambers approaches continuous...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT