Question

Please DO NOT copy other answers

8. Use dynamic programming to solve the following discrete-time optimal control problem: minimizeukozzou subject to Xt+1 = X+

0 0
Add a comment Improve this question Transcribed image text
Answer #1

0 Solution ; given that: ezi nimicola 0 Subjecled to *+1 = atau ao = 1, az=0 Here we have to minimize this by dynamic programSo od to F dor do tauo a = 1444 → t=1 alt =ajtalli *2 = (1+240)+QU, →@ t=2 42 agth = a2 + 3 &z= 1+40o + xu, tabr where x3=0 SEq @ = dy = 1+900+au. x = atau - kg - 1 eqr4 a2=- Elu2 So ear 6 will be - Tu +4 +4 ] ** ((a?+1-24 + 46+47-2+ et] (a-² ca-b2

Add a comment
Know the answer?
Add Answer to:
Please DO NOT copy other answers 8. Use dynamic programming to solve the following discrete-time optimal...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Please do not use the z transform to solve them. 3) Determine the inverse discrete-time Fourier...

    Please do not use the z transform to solve them. 3) Determine the inverse discrete-time Fourier transform of 3j 0< f s 0.5

  • Solve the following linear programming problem graphically:

    Solve the following linear programming problem graphically: Maximize Z=4X₁+4X₂, Subject to: 3X₁ + 5X₂ ≤ 150 X₁ - 2X₂ ≤ 10 5X₁ + 3X₂ ≤ 150 X₁, X₂ ≥ 0 1) Using the line drawing tool, plot the constraints by picking two endpoints for each line. Do not plot the nonnegativity constraints. 2) Using the point drawing tool, plot the five corner points which define the feasible region. The optimal solution is X₁ = _______ and X₂ = _______ (round your responses to two decimal places). Maximum profit is $_______  

  • Problem 1. (Calculating Edit Distance Using Dynamic Programming) A direct implementation of the above recursive scheme...

    Problem 1. (Calculating Edit Distance Using Dynamic Programming) A direct implementation of the above recursive scheme will work, but it is spectacularly inefficient. If both input strings have N characters, then the number of recursive calls will exceed 2N. To overcome this performance bug, we use dynamic programming. Dynamic programming is a powerful algorithmic paradigm, first introduced by Bellman in the context of operations research, and then applied to the alignment of biological sequences by Needleman and Wunsch. Dynamic programming...

  • PLEASE INCLUDE EXPLANATION AND DONT COPY FROM OTHER CHEEG ANSWERS Extra Credit: Suppose you are given...

    PLEASE INCLUDE EXPLANATION AND DONT COPY FROM OTHER CHEEG ANSWERS Extra Credit: Suppose you are given an undirected, connected, weighted graph G. You want to find the heaviest weight set of edges that you can remove from G so that G is still connected. Propose an optimal greedy al- gorithm for this problem and prove that it is optimal. (Hint: use matroid theory!).

  • Please don't copy answers from other posts i need a correct answer. Please solve it all....

    Please don't copy answers from other posts i need a correct answer. Please solve it all. Charlie joins a new reading club, from which he receives books to read. Suppose that books arrive as a Poisson process at a rate λ of books per week. For each book, the time it takes for Charlie to read it is exponentially distributed with parameter μ; ie., on average it takes Charlie їх1 weeks to finish one book. Assume that the reading times...

  • Please do all four parts for positive feedback. Solve the boundary-value problem for a string of...

    Please do all four parts for positive feedback. Solve the boundary-value problem for a string of unit length, subject to the given conditions. u(0,t) = 0, u(1,t) = 0, u(x, 0) = f(x), ut(x, 0) = g(x) f(x) = 1/20 sin πx, g(x) = 0, α = 1/π u(0,t) = 0, u(1,t) = 0, u(x, 0) = f(x), ut(x, 0) = g(x) f(x) = sin πx cos πx, g(x) = 0, α = 1/π u(0,t) = 0, u(1,t) = 0,...

  • Original answer please don't copy and paste from other answers Metallica Enterprise Ltd. can produce Copper,...

    Original answer please don't copy and paste from other answers Metallica Enterprise Ltd. can produce Copper, Steel and Aluminum at its factories at two cities. The factory in New Jersey can produce 6 tons of Copper, 2 tons of Steel, and 4 tons of Aluminum per day. The factory in San Francisco can produce 2 tons of Copper, 2 tons of Steel, and 10 tons of Aluminum per day. The rent of factory at New Jersey is $6000 per day...

  • Please do not copy the answers posted on other posts of this question as they are...

    Please do not copy the answers posted on other posts of this question as they are all wrong. Please answer part a and b fully, giving a table for a and clearly comparing the treatments and ranking them in part b as the question asks. 1. (Continuation of the Portland cement data) The tensile strength of Portland cement is being studied Four different mixing techniques can be used economically. A completely randomized experiment was conducted and the following data were...

  • Please answer both 4. 0-2 points TanFin1 14.1.022 Solve the linear programming problem by the simplex...

    Please answer both 4. 0-2 points TanFin1 14.1.022 Solve the linear programming problem by the simplex method. Maximize P 12x + 9y subject to x+ys 12 3x ys 30 10x + 7y 70 x 20, y 20 The maximum is P at (x, y)- Submit Answer Save Progress 5. -12 points TanFin11 4.1.028. Solve the linear programming problem by the simplex method. Maximize P2z subject to 2x y + zs 12 4x +2y 3z s 24 2x + 5y 5z...

  • The answer is one of the following: Please be descriptive!! 1. Use this exercise to convince...

    The answer is one of the following: Please be descriptive!! 1. Use this exercise to convince yourself that using different probabilities, the same discrete time chain may produce different stationary discrete time Markov chains with different transition matrices (we only consider two probabilities here in this problem; there are many other proba- bilities that can be chosen for which the process is not stationary or does not satisfy the Markov property). Consider two states 0 or 1 which a process...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT