Given the following image, what is the elevation at H11? 9.33 HI2 1.07 7.83 HI1 6.25...
7. Figure 3 is a table with an initial elevation, backsights, HIls, foresights, and computed elevations for a level loop, along with lengths of each leg. The loop does not close by computed elevations. Cum. RoundedAdjusted FS Elev Lengths l Length] Adjustment adjustment Elevation Raw Sta BM1 BS 452.35 TP1 TP2 BM2 4.67 457.02 6.45 459.14 6.94 460.52 4.33 452.69 5.56 453.58 5.54 454.98 4.55 454.91 4.48 459.46 5.80 460.71 5.25 461.59 2.79 459.20 BM3 140 ??? 4.37 456.34 110...
1. Use the following differential leveling field note to solve the following (a) Find the missing values? (10 marks) (b) Do the calculations check. (3 marks) (c) Calculate the misclosure. (3 marks) (d) Is this an open or closed level circuit? Why? (1+1 marks) (e) with respect to a new datum, if the elevation of BM S-770.730 and that of BM F = 773.510, what is the elevation of TP2 with respect to this new datum (3 marks) Point BM...
Part1 1. Given x- y+z=-2 x+ y-z=+2 Solve by Gassian Elimination not using matrices then using matrices. 1 Compute A transpose P A and A transpose* P *L 3. If m 5 and n = (a) How many rows are in A? (b) How many columns are in A? (c) How many rows are in P? (d) How many rows are in L? (e) What is the size of the system of equations that will be solved? (f) How many...
March 26, 2019 for a construction project. Given a grade of S4.24ft what should construction 4. A site-plan giv ves the proposed grade the surveyor use as Grade Rod? Answer A. Elev- BS B. HI-54.24 C54.24 D. 54.24-HI 5. The existing elevation and the proposed elevation are plotted together along a profile to determine Answer: A. Where to set the Grade Rod B. The amount to cut C. The amount to fill D. The amount to cut or fill 6....
From the following set of notes, what is the total elevation difference from point A to point D? Sta SD % HD Brg Ahd Brg Bk A 128.40 14 127.16 S 350 E B 141.35 -9 140.78 N 150 E N 350 W C 221.68 16 218.90 D N 640 W
Given the following information answer the following question. location A B C D annual fixed cost 150,000.00 130,000.00 120,000.00 100,000.00 variable cost per unit 60.00 80.00 90.00 100.00 annual volume-units 11,000 12,100 13,300 14,600 What is the total production cost for location C? 810,000.00 1,560,000.00 1,317,000.00 1,098,000.00
Given forecast errors of 8, 10, and 9, what is the mean absolute deviation? O A. 2/3 B. 1/3 C.:a. D. O QUESTION 5 Given forecast errors of 3, 6, and 9, what is the mean square error? A. 5 B. 6 c.7 D. 8 We were unable to transcribe this imageTime-series data may exhibit which of the following behaviors? O A. Trend B. Seasonality C. Cycles D. All of the above QUESTION 9 In business, forecasts are the basis...
Answer the following questions Q1. The image digitisation process consists of, in general, three components to convert the continuous signal into digital form, including sampling (or discretisation in time/space), quantization (discretisation of amplitude) and coding (generation of binary code for each quantised level) a. Name the major distortions associated with the above image digitisation process [2 marks] Name the areas of principal applications (or the basic classes of problems) which are covered by image processing. b. Discuss the main issues...
Given the following cumulative distribution of daily stock
returns:
What is the actual probability (based on the actual
cumulative distribution) that daily return will be between -1.74%
and +2.5227?
a. 17.36%
b. 84.94%
c. 67.58%
d. None of the above
Actual Cumulative Cumulative Normal Return Value Frequency 0.10266 0.09414 0.08561 0.07709 0.06856 0.06003 0.05151 0.04298 0.03446 0.02593 0.0174 0.00888 0.00035 0.008175 0.016701 0.025227 0.033753 0.042279 0.050805 0.059331 0.067857 0.21% 0.21% 0.21% 0.21% 0.21% 0.42% 1.00% 3.14% 5.02% 11.09% 17.36% 30.33%...
c++ questions need help QUESTION 1 Given the following code, what is the value of *ptr? int var = 5; int *ptr = &var; int *myptr = ptr; *ptr = -8; var = 0; *myptr = 2; a. 2 b. -8 c. 5 d. 0 QUESTION 2 Given the following code, what is the value of ptr+1? int arr[3] = {0, 0, 0}; int *ptr = arr; *ptr = 8; a. 9 b. undefined c. the address of arr[0] d....