Determine the number of machines to be assigned to an operator. The setup time is 2.5...

Determine the number of machines to be assigned to an operator.
The setup time is 2.5 mins and the run time is 6 mins. Machine can run automatically without supervision.
Assume walking time is negligible between the machines.
Operator rate is $20/hour and machine rate is $50/hour. Draw the multiple activity chart and show the two appropriate combinations of the assignment.
Use the formula done in class to determine the two appropriate combinations of machines per operator. Formula is n=(l+m)/(l) . n is number of machines, l is operator total loading and unloading time, and m is total machine running time.

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Determine the number of machines to be assigned to an operator. The setup time is 2.5...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Problem 2: A company wishes to assign multiple machines to an operator to minimize costs The foll...

    Problem 2: A company wishes to assign multiple machines to an operator to minimize costs The following times have been collected: Loading machine standard time 034 min Unloading machine standard time Walk time between machines Operator rate Machine rate Power feed time (machining time) 0.26 min 0.09 min $15.00/h S22.00/h 1.56 min - 1. 2. 3. 4. 5. Determine the optimal number of machines per operator to minimize unit cost. Create a worker-machine chart. (Suggestion: use Excel or insert a...

  • Bob Thomason produces theorems using hours of labor and Big Machines. In the short run, his...

    Bob Thomason produces theorems using hours of labor and Big Machines. In the short run, his labor is a variable factor but the number of Big Machines is fixed. When he works for L hours using M Big Machines, Bob can produce L-M theorems. There are only 3 Big Machines in the world, and they can only be rented in whole number quantities (you can.not employ 1/2 of a Big. Machine). Bob's time is worth $1 per hour, and it...

  • Bob Thomason produces theorems using hours of labor and Big Machines. In the short run, his...

    Bob Thomason produces theorems using hours of labor and Big Machines. In the short run, his labor is a variable factor but the number of Big Machines is fixed. When he works for L hours using M Big Machines, Bob can produce L·M theorems. There are only 3 Big Machines in the world, and they can only be rented in whole number quantities (you can not employ 1/2 of a Big Machine). Bob's time is worth $1 per hour, and...

  • Product costs using activity rates Setup Hercules Inc. manufactures elliptical exercise machines and treadmills. The products...

    Product costs using activity rates Setup Hercules Inc. manufactures elliptical exercise machines and treadmills. The products are produced in its Fabrication and Assembly production departments. In addition to production activities, several other activities are required to produce the two products. These activities and their associated activity rates are as follows: Activity Activity Rate Fabrication $25 per machine hour Assembly $31 per direct labor hour $94 per setup Inspecting $18 per inspection Production scheduling $17 per production order Purchasing $8 per...

  • Outlane Limited’s overhead budget for a certain period is as follows: £000 Administration 100 Depreciation of...

    Outlane Limited’s overhead budget for a certain period is as follows: £000 Administration 100 Depreciation of machinery 80 Employee’s National insurance 10 Heating and lighting 15 Holiday Pay 20 Indirect labour Cost 10 Insurance: Machine 40 Property 11 Machine maintenance 42 Power 230 Rent and rates 55 Supervision 50 The company has four departments: L, M, N and O. the following information relates to each department. Department L M N O Total number of employees 400 300 200 100 Number...

  • Operations Management

    In the molding shop, there are 11 machines capable of molding the one part done in-house, but historically one machine is always being maintained or repaired at any given time. Each machine requires a full-time operator who earns an hourly wage of $15, though only 50 minutes of a molding operator's typical hour is occupied with the tasks of loading, unloading, actively monitoring, and adjusting the machine. The machines can each produce 25 parts per hour. The workers will work...

  • a) A workpiece (φ-75 mm, 1 275 mm) is machined using turning at a feed rate of 0.25 mm/rev. At a cutting speed- 3.5 m/s, the turning tool is ineffective after machining 3 parts, and at a cutting s...

    a) A workpiece (φ-75 mm, 1 275 mm) is machined using turning at a feed rate of 0.25 mm/rev. At a cutting speed- 3.5 m/s, the turning tool is ineffective after machining 3 parts, and at a cutting speed = 2.5 m/s, the turning tool is effective for producing 20 parts. Calculate the Cutting Speed that will allow 30 parts to be machined between tool changes [20 marks] b) An aluminium alloy workpiece (tensile strength - 325 N/mm2 and yield...

  • The Europa Company has a large warehouse in Florida to store its inventory of goods until...

    The Europa Company has a large warehouse in Florida to store its inventory of goods until they are needed by the company’s many furniture stores in that area. A single crew with four members is used to unload and/or load each truck that arrives at the loading dock of the warehouse. Management currently is downsizing to cut costs, so a decision needs to be made about the future size of this crew. Trucks arrive randomly at the loading dock at...

  • Total Budgeted Manufacturing Overhead Cost Allocation Base Activity Materials handling $ Number of parts Machine setup...

    Total Budgeted Manufacturing Overhead Cost Allocation Base Activity Materials handling $ Number of parts Machine setup 13,200 5,200 49,500 86,100 Number of setups Number of parts Insertion of parts Finishing Finishing direct labor hours $ 154,000 Total Print Done * Requirements 1. Compute the cost allocation rate for each activity. 2. Compute the manufacturing overhead cost that should be assigned to Job 420. 3. Compute the manufacturing overhead cost that should be assigned to Job 510 Print Done Farragut Company...

  • (a) An overhead trolley conveyor is configured as a continuous closed loop. The delivery loop has...

    (a) An overhead trolley conveyor is configured as a continuous closed loop. The delivery loop has a length of 120 m and the return loop 80 m. All parts loaded at the load station are unloaded at the unload station. Each hook on the conveyor can hold one part and the hooks are separated by 4 m. Conveyor speed 1.25 m/s. Determine: (i) maximum number of parts in the conveyor system, (ii) parts flow rate; and (ii) maximum loading and...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT