**Cost : It is not a constraint in design of transformer vault because transformer vault do not requires costly materials to get built up !!
**Safety : No, safety is never a constraint in design because it meant for safety of workers and must be followed as per prescribed electric codes and NEC standards
**Equipment sizing : Yes , it can be a constraint on design of vault because the size of equipment like transformer and circuit breaker are variable as per need of user with different voltage and kVA ratings, hence being a variable factor it can be a constraint !!
**Equipment temp/heat level : Equipment heating is also a variable factor that depends upon amount of electrical loading put on transformer, so it can also act as constraint to vault design and build up !!
**Raise doubts if any and provide rating as feedback please !!
which of the following are constarins of the design and build of a trnaformer vault and...
Which of these may be cosidered an attrubute to the constrution and design of a transformer vault? and Why? Air quality, heat level, equipemtn temperature , safety, water ingress
Waterproofing will prevent groundwater from entering the vault. It is estimated that the vault has a weight of 35 kips, exclusive of the vault floor, which has a thickness equal tot. A sump pump will prevent any water from accumulating inside the vault. A factor of safety of at least 1.5 is required to guard against buoyant uplift of the vault. Write an equation for the buoyant uplift force on the vault; then, compute the floor thickness (t) in feet...
What is Responsive Design? Why should you build a website using Responsive Design approach instead of building a separate website for mobile?
4. The Owner's ability to influence design and cost is highest at the construction phase. a. True b. False 5. The conceptual estimate is useful in the schematic design phase when design details are not available. a. True b. False 6. A Cost-Plus contract is considered a reimbursable type of contract. c. True d. False 7. An advantage of a Lump Sum Contract is that the owner assumes the risk of construction cost. e. True f. False 8. A Design-Bid-Build...
Design and build a sequential circuit in Logisim to count in the following manner: Q(t + 1) = (Q(t) + 5) MOD 9. That is, your circuit should count 0, 5, 1, 6, 2, 7, 3, 8, 4, and 0 (then it will repeat). To build this circuit, we will be using JK flip flops.
Please simulate and build a speech filter. The design should operate on less that ±6 Volts DC in Multisim. please show all works. Your circuit should address the following: Demonstrate the speech filter response of the design. Power analysis of the design What could you have done differently to make the circuit more efficient whether its cost, performance or simply a different design implementation? Project Requirements Create a project chair Research low power operational amplifier circuits. Assign task to team...
Cet 440 QUESTION 15 which construction contract method BETTER lends itself to fast-tracking? Design-Bid Build o Separate QUESTION 16 Most contracts allow the general contractor to bill for retainage once which stage of construction has been achleved? Substantial completion Final completion oStatute of limitations 50% completion o 3 5 6
Figure right shows the cross- section of a concrete retaining structure with the following dimension: Top width a 5m Bottom width b 8m .c18 kN/m3 .SOIL: 250, d18 kN/m3, Design criteria Factor of safety against overturning> 2.5 Factor of safety against sliding > 1.5 Is this design acceptable and why? And what measures can to be used to improve the design? Figure right shows the cross- section of a concrete retaining structure with the following dimension: Top width a 5m...
Which of the following are responsible for evaluating equipment inventories for material readiness, amortization, and technology transfer? Environmental engineer Entry-level environmental specialist Senior-level environmental specialist Occupational health and safety specialist
which of the following is included in the investment component of gdp? Which of the following is included in the investment component of GDP? O spending to build new houses O spending to build new factories O spending on business equipment such as welding equipment O All of the above are included in the investment component of GDP.