How would your plan change if you included the cost of the production supervisor, quality engineer, and purchasing agent? The salaries of all three are $50/hour and the problems usually take 30 minutes, 60 minutes, and 45 minutes respectively.
100% Inspection is time-consuming or destructive. So following up statistics rather than the fixed percentage is recommended. And generally, Normal severity and Level-2 AQL criteria are used for Inspection:
Given details are: At 2% rejection Level:
Single Sampling
A manufacturer wishes to sample a purchased component used in his assembly. He wishes to reject...