Question

My final year project is underground cable fault detecton. kindly guide me about its abstract ,...

My final year project is underground cable fault detecton. kindly guide me about its abstract , project implementation , the proper list of components required required for it. its objectives , and last also guide specify technical details of final delieverable. can this project can be done with pic microcontroller?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

**Underground cable fault detection can be made using PIC16F877A microcontroller based upon Ohms law .

In this project we can program the microcontroller to display fault status if detected in wires prototype that resembles cables carrying current . We can create short circuit using manual switches and simultaneously making microcontroller to read the data of current and voltage and match it with pre defined fault limits set by the user .

Now , we can connect an LCD display to show fault staus of phases or connect a GPS module to send message to utility providing remote location status at base station !!

**

PIC microcontroller as per your voltage and current input output requirements preferably the PIC16F877A.

Power supply or rectifier unit made of diodes to convert AC from power socket of lab to DC voltage required by microcontroller and short circuit setup of wires and switches

LCD display for offline status display model or GPS module for distant online status based model .

Switches (single pole double throw ) and resistances and wires to resemble the model of cable .

**You have 3 modules to make to get final assembly as your project

1) Status Display Module : To display fault status if any present . this can be made by GPS with phone or PC display / LCD direct on site display

2) Microcontroller module : Program microcontroller as per fault standards required . Here apply ohms law to determine the voltage and current in wires that can be categorised as fault conditions of whether open/ short circuit . Accordingly , proceed with design of the cables module whose data is being read by microcontroller . Use appropriate resistance wherever required .

3) Power supply module (Diode full wave rectifier)

**Yes , you can use PIC microcontroller for the project but it will be better to use Arduino as it's programming is quite easy and simple to understand .

Add a comment
Know the answer?
Add Answer to:
My final year project is underground cable fault detecton. kindly guide me about its abstract ,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Hi, Kindly assist with my project management assignment below using the attached case study Question 1 Update the project charter for the remainder of the project in response to Adams’ memo (lines 241...

    Hi, Kindly assist with my project management assignment below using the attached case study Question 1 Update the project charter for the remainder of the project in response to Adams’ memo (lines 241 through 246). Question 2 Prepare a plan for the remainder of the project in response to Adams’ memo (lines 241 through 246). Your answers to the above will be assessed in terms of the level of communication displayed, the insights and inferences drawn, and your ability to...

  • Project overview: Create a java graphics program that displays an order menu and bill from a...

    Project overview: Create a java graphics program that displays an order menu and bill from a Sandwich shop, or any other establishment you prefer. In this program the design is left up to the programmer however good object oriented design is required. Below are two images that should be used to assist in development of your program. Items are selected on the Order Calculator and the Message window that displays the Subtotal, Tax and Total is displayed when the Calculate...

  • Please help writing a well structured document using the below Agile Runbook - Our Overall Delivery Process How do we initiate a Project? Any project is a response to a pain point or desire expresse...

    Please help writing a well structured document using the below Agile Runbook - Our Overall Delivery Process How do we initiate a Project? Any project is a response to a pain point or desire expressed by either customers, internal stakeholders, employees, or regulatory authorities. In short, a project is a time bound and specific goal oriented task-system that is born out of an ask from any stakeholder. Project initiation is laying down a new project by defining its goals, objectives,...

  • Project is about "House of Kaviari," and the industry is Caviar Industry. I only want Part.6...

    Project is about "House of Kaviari," and the industry is Caviar Industry. I only want Part.6 "Identify Critical Issues and Priorities" BUSINESS STRATEGY ANALYSIS REQUIRES THE FOLLOWING: 1. Identify strategic goals. – A firm's strategic goals drive business strategy and address the key success factors of the industry. Strategic goals often include the vision or mission statement for the business. They should also set the direction and standard for financial and market results against which actual performance can be measured....

  • Project is about "House of Kaviari," and the industry is Caviar Industry. I only want Part.4...

    Project is about "House of Kaviari," and the industry is Caviar Industry. I only want Part.4 "Strategic Performance" BUSINESS STRATEGY ANALYSIS REQUIRES THE FOLLOWING: 1. Identify strategic goals. – A firm's strategic goals drive business strategy and address the key success factors of the industry. Strategic goals often include the vision or mission statement for the business. They should also set the direction and standard for financial and market results against which actual performance can be measured. The two most...

  • Project 7: Vehicles 1 Objective In the last couple projects, you’ve created and used objects in...

    Project 7: Vehicles 1 Objective In the last couple projects, you’ve created and used objects in interesting ways. Now you’ll get a chance to use more of what objects offer, implementing inheritance and polymorphism and seeing them in action. You’ll also get a chance to create and use abstract classes (and, perhaps, methods). After this project, you will have gotten a good survey of object-oriented programming and its potential. This project won’t have a complete UI but will have a...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • internal project 1 anything helps! thank you!! Instructions: Study the case that starts on page 3...

    internal project 1 anything helps! thank you!! Instructions: Study the case that starts on page 3 carefully. Then write concise answers to the following questions regarding the internal control system of Duarf, Inc. Clearly label your responses with proper headings and subheadings. Be very specific and precise. Answers that appear to be beating around the bush will not get any credit. 1. What are the controls in place that under normal conditions should function well to prevent embezzlements or frauds?...

  • Hello, If anyone can help me I will grestly appreciate it! I will also give a...

    Hello, If anyone can help me I will grestly appreciate it! I will also give a thumbs up! Autotech Manufacturing is engaged in the production of replacement parts for automobiles. One plant specializes in the production of two parts: Part 127 and Part 234. Part 127 produces the highest volume of activity, and for many years it was the only part produced by the plant. Five years ago, Part 234 was added. Part 234 was more difficult to manufacture and...

  • What an Executive Summary Is An executive summary is a specific type of document that does...

    What an Executive Summary Is An executive summary is a specific type of document that does two things: it summarizes a research article, and it offers recommendations as to how information from the article can be used. Some long reports can contain an executive summary section, as indicated in the Pearson handbook. Write a 2 pahe Executive Summary In business contexts, an executive summary is always written for a specific purpose: to explain the information in the article to a...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT