For a reaction AB -> A + B, the following kinetics data was collected:
Time (s) ------- [AB] (M)
0 ---------- 1.1200
50 ---------- 0.5412
100 ---------- 0.3560
150 ----------- 0.2652
200 --------- 0.2122
250 ------------ 0.1756
300 -------- 0.1509
350 ---------- 0.1320
400 ----------- 0.1172
450 ------------ 0.1054
500 --------- 0.0957
What is the value of the rate constant?
What will [AB] be after 34 seconds?
please show work. Thank you!!!
For a reaction AB -> A + B, the following kinetics data was collected: Time (s)...
Data for the following reaction was collected at 25.0 degrees celsius. Br2(aq) -> products Time (s) [Br2] (M) 0 0.0120 50 0.0101 100 0.00846 150 0.00710 200 0.00596 250 0.00500 300 0.00420 350 0.00353 400 0.00296 (a) Make three plots of this data and use the appropriate plot to determine the rate law expression. (please tell me how to graph this on excel?) (b) What is the value of the rate constant?
Data for the following reaction was collected at 25.0 ºC. Br2(aq) → products Time (s) [Br2] (M) 0 0.0120 50 0.0101 100 0.00846 150 0.00710 200 0.00596 250 0.00500 300 0.00420 350 0.00353 400 0.00296 (a) Make three plots of this data and use the appropriate plot to determine the rate law expression. (b) What is the value of the rate constant?
For each of the intersections shown in the following figures, determine whether the data support each of the nine signal warrants. For each problem, and each warrant, indicate whether the warrant is (a) met (b) not met (c) not applicable (d) insufficient information given to assess. For each problem, indicate (a) whether a signal is warranted, (b) the type of signalization that should be considered, and (c) whether pedestrian signals and/or pushbuttons are recommended In all cases, assume that no...
Time (s) NO2] ILKIO 1.00E-02 60 6.83E-03 as 120 5.18E-03 180 4.18E-03 oaibrate tdn 240 3.50E-03 300 3.01E-03 otoge 360 2.64E-03 2. From the graphs and the R2 values, what is the order of the reaction? 3. The balanced chemical reaction for the degradation of NO2 into NO and O2 is: 2 NO22 NO + O2 The rate law for the reaction is: Rate = k[NO22 If the instantaneous rate at 60 seconds is 0.361 M/s, what is the value...
what is the scale for this graph? HOME WORK hilly track. Use the graph plotting techniques find slope and 1. A data set is given in table 2 for a car going on a to find out the trend between "time" taken and "distance" covered by the car. Also y-intercept of the straight line on the graph. TABLE 2 X 50 150 250 350 400 450 500 550 100 200 300 600 (seconds) y 10 40 70 100 140 180...
please type it do not handwritten Data were collected on the prices of parts at each shelf in auto parts showroom in Melbourne. The prices of parts at each shelf, are given below. 50 60 550 100 160 60 30 230 120 140 100 20 53 130 190 120 300 10 100 120 140 140430 230 240 250 120 170 200 250 400 139 180 200 260 320 630 200 140 530 450 170150190 300 250 140 270 280 290...
(12 marks) (a) In a triaxial test for sand (c) the stress increment (s)-2.5o. What is the angle of internal frictica (o (b) A consolidated undrained (CU) triaxial test was performed on two samples of a clay and the results are: Test No. Cell pressure (kNm) Devilo stress ( km) Pore water pressure (kN) G; 1 150 500 220 (i) The Mohe circles and the failure line in terms effective stresses are drwn as shown in the figure below. List...
Storm data were collected for a 810-acre basin. Approximations for the wadi-flow, rainfall and runoff cumulative mass curves are shown in the following figure. 5.00 500 485 4.75 450 445 4.50 4.25 4.00 425 Cumulated DRO -Cumulated gross rainfall Wadi-flow 400 3.75 3.50 350 3.25 315 3.00 295 300 2.75 Cumulated Gross rainfall and DRO in inches 2.50 250 Wadi flow (cfs) 2.25 215 2.00 200 1.75 1.50 155 150 140 1.25 1.00 100 90 0.75 75 0.50 55 50...
Use the graph to illustrate the effects of inflation on the money market. The interest rate is the opportunity cost of holding money. What happens to the opportunity cost of holding money 10 Money supply when inflation occurs? 8 The opportunity cost of holding money decreases. 7 The opportunity cost of holding money increases 6 The opportunity cost of holding money is constant 5 The opportunity cost of holding money increases 4 but then decreases. Money demand 2 1 250...
Problem # 14 Aggregate and Disaggregate Planning Hershey's collected the following data for 10 periods. It has been provided to determine the total cost of those periods. Use any kind of strategy to determine the cost. Initial Inventory: 200 Production in regular time: 80/person Production in overtime: 40/person Production by sub-contractors: 80/person Production cost in regular time: 100/unit Production cost in over time: 300/unit Production cost by sub-contractor: 400/unit Regular time available resources: 40 Inventory cost per unit per period:...