A four set of 750KW Generator rated at 400V, 3Ph, 0.8
P.F, 60Hz, 1800 rpm connected in parallel
is said to operate during a power interruption. The continuous
operation of the generator is said
the last for 24 Hrs. Generator operation is working at 2 sets at a
time once it reached the 40%
connected loading during synchronization then will transfer to the
other 2 sets after 4 hours.
This sequence happens for the whole duty cycle (24 hours). How much
power is consumed
during 1 hour of operation if the required power efficiency is 80%.
The 100% connected load is
at 1.75MVA. (neglect the type of connection Y-Y or Y-delta). What
is the possible voltage
regulation. (Assumed possible variable and values to complete the
equation.)
A four set of 750KW Generator rated at 400V, 3Ph, 0.8 P.F, 60Hz, 1800 rpm connected...
S. A three-phase, 4-pole, Y-connected synchronous generator is rated 575V, 200k VA, 60Hz. The generator's synchronous reactance is X-0.Q. Losses are negligible. The generator is comnected to an ideal 575V three- phase 60 Hz bus. Use V, for phase a-to-neutral as the reference angle (a) The generator's input power is 150kW. The generator's field current is adjusted to 10A which caases the generator to operate at unity power factor. What is the generator's phase-a armature current Ia (magnitude and phase)?...
A synchronous generator is driven by a diesel engine to provide electricity to a remote mining operation. The generator is three-phase, Y-connected, 60 Hz, 900 rpm, 600 V, 3300 kW, 4125 kVA, and it has a synchronous reactance of 0.120 Ω per phase. Ignore all losses, and assume the machine iron is not saturated.(a) The generator is set to deliver its rated active power at unity power factorand rated terminal voltage. Determine:i. The speed of the diesel engine driving the generator;ii. The rotor electrical...