A flow meter and variable speed pump have just been installed on the flow line for the concentrate thickener. The variable speed pump has been installed near the mixing tank and the magnetic flow meter has been installed at the dosing point of the thickener. The distance between the reagent mixing tanks and the concentrate thickener is 730 m.

A step test is performed to obtain the dynamic response of the flow to a change in pump speed. The full scale of the flow controller measurement is 500 L/min and the full scale for the controller output is 100%. The response is shown below in Figure 1. Manually characterize the response curve to determine the process gain (Kp), time constant (p) and dead time (tD). Show your working. (5 marks)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Hey dear please provide the figure that is mentioned in the question. Without the response figure the problem can't be solved. So I humbly request you to upload the figure so that you can be helped with the solution. Thank you.

Add a comment
Know the answer?
Add Answer to:
A flow meter and variable speed pump have just been installed on the flow line for...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized...

    Case 27 To Use or Not to Use? Beaufort Sea Production Company (BSPC) operates a medium-sized oil field on Alaska’s north coast. The field is still producing at its maximum rate, 325,000 barrels of oil per day (BOPD). However, to sustain this rate the company started a waterflood of the reservoir two years ago. Now a capacity bottleneck in the water disposal process is threatening to curtail production. In waterflooding, salt water from the Beaufort Sea is treated to remove...

  • summatize the following info and break them into differeng key points. write them in yojr own...

    summatize the following info and break them into differeng key points. write them in yojr own words   apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...

  • summarizr the followung info and write them in your own words and break them into different...

    summarizr the followung info and write them in your own words and break them into different key points.   6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT