Question

Data for six weeks from a carpeting crew is as follows: Week Crew Size Yards Installed...

Data for six weeks from a carpeting crew is as follows:


Week Crew Size Yards Installed
1 4 96
2 3 72
3 4 92
4 2 50
5 3 69
6 2 52

Compute the labor productivity (= yards installed per crew member) for each of the six weeks. Which week has the highest productivity?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer 1:

Labor productivity (= yards installed per crew member) is computed for each of the six weeks as below:

Answer 2:

From the answer above, we observe that highest productivity is 26 Yards installed per crew member which occurs in week 6.

Week 6 has highest productivity.

Add a comment
Know the answer?
Add Answer to:
Data for six weeks from a carpeting crew is as follows: Week Crew Size Yards Installed...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 1. A catering company prepared and served 300 meals at an anniversary celebration last week using...

    1. A catering company prepared and served 300 meals at an anniversary celebration last week using eight workers. The week before, six workers prepared and served 240 meals at a wedding reception. a. For which event was the labor productivity higher? Explain. b. What are some possible reasons for the productivity differences? 2. The manager of a crew that installs carpeting has tracked the crew's output over the past several weeks, obtaining these figures: Week Crew Size Yards Installed 4...

  • The manager of a crew that installs carpeting has tracked the crew's output over the past...

    The manager of a crew that installs carpeting has tracked the crew's output over the past several weeks, obtaining these figures: Week Yards Installed 100 75 105 55 a. Compute the labor productivity for each of the weeks. (Round your answers to 2 decimal places.) Labor productivity (Yards/Person) Week rew size b. Which crew size works best? A crew of seems to work best.

  • 2. The manager of a crew that installs carpeting has tracked the crew's output over the...

    2. The manager of a crew that installs carpeting has tracked the crew's output over the past several weeks, obtaining these figures: Week Crew Size Yards Installed به لبه NW NA Wt ه ه ی Compute the labor productivity for each of the weeks. On the basis of your calculations, what can you conclude about crew size and productivity?

  • Chapter 2 Homework Help Save & Exit Su Problem 2-2 The manager of a crew that...

    Chapter 2 Homework Help Save & Exit Su Problem 2-2 The manager of a crew that installs carpeting has tracked the crew's output over the past several weeks, obtaining these figures: points Crew Size Yards Installed 102 eloos References a. Compute the labor productivity for each of the weeks. (Round your answers to 2 decimal places.) Week Labor productivity (Yards/Person) Crew size b. Which crew size works best? A crew of seems to work best.

  • Perform a multi-factor analysis for each week using both input factors together (labor & materials) Perform...

    Perform a multi-factor analysis for each week using both input factors together (labor & materials) Perform a single factor productivity analysis for each week using each of the two inputs separately (labor & materials) DATA:          Input Week Output Labor Amt Matls # 1 96 4 60.0 2 72 3 50.0 3 92 4 100.0 4 50 2 40.0 5 69 3 60.0 6 52 2 50.0 Materials = $50.00 per pound (#) Labor = 8 hours/day @ 5 days/wk...

  • How many days would it take a crew to install 13,600 LF of base molding if...

    How many days would it take a crew to install 13,600 LF of base molding if they work five, eight-hour days per week and are able to install 100 LF of base molding per hour? How many days would it take a crew to install 13,600 LF of base molding if they work eleven-hour days, six days per week if their hourly productivity rate is 100 LF when not working overtime? Table 1: Production Efficiency Table for Use in Questions...

  • Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars....

    Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars. Assume 40-hour weeks and an hourly wage of $14. Overhead is 1.5 times weekly labor cost. Material cost is $8 per pound. (Round your answers to 2 decimal places.)       Week Output (units) Workers Material (lbs) 1 29,000 4 470 2 34,000 7 540 3 30,000 7 490 4 35,000 9 530

  • Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars....

    Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars. Assume 40-hour weeks and an hourly wage of $16. Overhead is 1.5 times weekly labor cost. Material cost is $9 per pound. (Round your answers to 2 decimal places.) ] Week Output (units) Workers Material (lbs) 1: 28,000 7 430 2: 33,000 8 480 3: 32,000 4 520 4: 42,000 9 620

  • QUESTION 18 Questions 15-18) The following table shows data on the average number of chocolate bars...

    QUESTION 18 Questions 15-18) The following table shows data on the average number of chocolate bars produced each week, together with data for labor and material Assume 40-hour weeks and an hourly wage of $15 Overhead is 1.5 times weekly labor cost Material cost is $10 per pound #Chocolate bars Produced / Weekl#Workers Material (lbs Week 1 Week 2 40,000 45,000 6 510 530 Compute the productivity growth from Week 1 to Week 2 using the multifactor productivities. Round the...

  • The Langosta Company reported data for 1997 and 1998 as follows: 1997 1998 The number of...

    The Langosta Company reported data for 1997 and 1998 as follows: 1997 1998 The number of machines produced 60.000 75.000 Labor hours 20.000 18.750 The material used (kg) 600.000 850.000 Selling price per unit (machine) $50 $45 Hourly labor costs $10 $10 Material cost per kg $2 $4 REQUESTED: 1. Calculate productivity profiles in 1997 and 1998. Are there productivity improvements? 2. Calculate productivity measures related to earnings for 1998. Are there productivity improvements?

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT