A manufacturing firm is determining the production and inventory plan to meet demand in the next...

A manufacturing firm is determining the production and inventory plan to meet demand in the next three months. The production facility can produce at most 400 units in one month. The cost of producing one unit in the next three months are respectively 28, 30, and 40 dollars. The cost of carrying one unit of inventory in the next three months are respectively are 2, 3, and 3 dollars. Assume that the firm has a starting inventory of 20 units. The demand for the next three months are respectively 200, 250 and 400 units. Build a mathematical formulation that will minimize the production and inventory costs while ensuring that monthly demands are met.

a. Define the decision variables using complete sentences

b. Write down the objective function in words

c. Write down the constraints using complete sentences

d. Express the objective function mathematically using the decision variables defined in part a

e. Express the constraints mathematically using the decision variables defined in part a; see slides for an example

f. Input the mathematical formulation into an Excel worksheet in an organized fashion. Once done organizing the worksheet then copy paste the table from Excel into Word showing the setup of your worksheet. DO NOT turn in the EXCEL worksheet. All homework answers should be in one file formatted as pdf.

g. What is the optimal solution? (Use solver to determine the solution)

h. What is the optimal objective function value? (use solver to determine the optimal objective function value)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

(a) Decision variable shall be how much to produce per month (g) so that demand is met as well as units are produced with lowest possible production cost (i) and units carry forward (h) after demand is fulfilled lead to least carrying cost (j).

(b) Objective function is to minimize the production cost and inventory carrying cost by ensuring demand is fulfilled. Where

  1. d is production cost per unit per month
  2. g is produced units in corresponding month
  3. e is carrying cost per unit per month
  4. h is carry forward units in each month

(c) Constraints are Maximum units that can be produced in a month is 400. That is ,

(d) Objective Function :- Minimize : d * g + e * h
(e) Constraint for maximum production units per month is a

Model is as below :-

Add a comment
Know the answer?
Add Answer to:
A manufacturing firm is determining the production and inventory plan to meet demand in the next...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Hello, I need help with the following problem: 1. Multi-period production problem. Formulate the production and...

    Hello, I need help with the following problem: 1. Multi-period production problem. Formulate the production and inventory problem at XXI Company using Excel. See narrative below Solve the problem in Excel XX1 Company Production and Inventory Problem Narrative A company named XX1 has contracted to produce products A and B, over the months of June, July and August. The total production capacity (expressed in hours) varies monthly. The following table provides the basic data for the situation. June July August...

  • You’ve been asked to develop a problem that can be used to explain some of the concepts you know to someone who has neve...

    You’ve been asked to develop a problem that can be used to explain some of the concepts you know to someone who has never heard of linear programming. 1. Formulate a maximization problem such that the following conditions are met (you may not use a problem has appeared on this assignment). Make sure to include all elements of formulation that we have discussed (i.e., objective function, constraints, non-negatives). a. LP problem with two decision variables (using X and Y as...

  • 1) (25pts) An engineer is making aggregate planning for the next 4 months. Demand forecasts in...

    1) (25pts) An engineer is making aggregate planning for the next 4 months. Demand forecasts in aggregate items are 600, 350, 400, 700 for months 1 to 4. The company has an initial workforce of 80 and capacity can be adjusted by hiring (at a cost of 150 liras per worker) or firing (at a cost of 900 liras per worker). Each worker is capable of producing 0.2 aggregate items in one workday. The available workdays are given as 25,...

  • Using Linear Programing to solve Make or Buy problem. The Carson Stapler Manufacturing Company forecasts a...

    Using Linear Programing to solve Make or Buy problem. The Carson Stapler Manufacturing Company forecasts a 5000-unit demand for its Sure-Hold model during the next quarter. This stapler is assembled from three major components: base, staple cartridges, and handle. Until now Carson has manufactured all three components. However, the forecast of 5000 units is a new high in sales volume, and it is doubtful that the firm will have sufficient production capacity to make all the components. The company is...

  • Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below....

    Gang Aft Agley, a manufacturing company, faces the aggregate planning problem shown in the table below. Cost of regular production is $5 per unit, the cost of producing the same unit on overtime is $7.50, the cost of subcontracting is S9 per unit, an<d the cost of carrying a unit in inventory from one month to the next is $2 The labor contract at the plant prohibits overtime output to exceed 300 units in any five month window (that is...

  • 1. A manufacturing company would like to maximize the profit of manufacturing four products.  The time in...

    1. A manufacturing company would like to maximize the profit of manufacturing four products.  The time in hours required for each product in each production department is tabled below, along with the profit for each product. Product 1 Product 2 Product 3 Product 4 Department A 25 20 30 15 Department B 12 10 10 15 Department C   8   7 5 6 Profit $110 $90 100 95 Currently, labor assignments provide for 4800 hours in Department A, 3000 hours in Department...

  • Answers please Production and Operations Management (29:623:311) Spring 2019 3. A linear programming model is given...

    Answers please Production and Operations Management (29:623:311) Spring 2019 3. A linear programming model is given as follows: maximize Z = 50x1 + 80x2 + 64x3 + 80x4 Subject to 5xit 2.5x2 +4.5x3 +3.99x, S 600 4.1x, + 2.6xz +5.5x +1.9x, S 500 15x, 22x2 +18x3 +25x4 S 400 8x+ 12.6x2 +9.7x3 +10.55x4 S 1700 x1 + x2 2 0.60 (a) Solve the problem by using excel solver. (b) What are the sensitivity ranges for the objective function coefficients? (c)...

  • Show Work ABC Corporation has three plants with production capacity and plans to begin a production...

    Show Work ABC Corporation has three plants with production capacity and plans to begin a production of a product that can be made in three sizes – large, medium and small – that yield a net unit profit of $420, $360 and $300 respectively. Plants 1, 2 and 3 have capacity to produce 750, 900, and 450 units per day of this product, respectively, regardless of the size or combination of sizes involved. The amount of available storage space also...

  • The Mehta firm can normally produce 75 stainless steel sinks in a month. This is done...

    The Mehta firm can normally produce 75 stainless steel sinks in a month. This is done during regular production hours at a cost of $100 per sink. If demand in any one month cannot be satisfied by regular production, the production manager has three other choices: (1) he can produce up to 40 more sinks per month in overtime but at a cost of $150 per sink; (2) he can purchase a limited number of sinks from a friendly competitor...

  • Hawkins Manufacturing Company produces connecting rods for 4- and 6-cylinder automobile engines using the same production...

    Hawkins Manufacturing Company produces connecting rods for 4- and 6-cylinder automobile engines using the same production line. The cost required to set up the production line to produce the 4- cylinder connecting rods is $1,800, and the cost required to set up the productlon line for the 6-cylinder connecting rods is $3,100. Manufacturing costs are $13 for each 4-cylinder connecting rod and each week as to which product will be manufactured the following week. If a production changeover is necessary...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT