Question

Production activity control (PAC) actions take place mainly in which section of the MPC system? Because...

  1. Production activity control (PAC) actions take place mainly in which section of the MPC system?

Because these activities change over time and react differently to different markets and strategies. MPC system is related with planning and governing all aspects of fabricating, including managing materials programing machines and people, and organization suppliers and key customers, so it is true

  1. The shop-floor control system is kept current on changes in material plans by the MRP system? (True/False)

True, Yes, the shop floor control system is given preference on changes in material plans by the Manufacturing Resources Planning system. Once planned, ordered, and purchased requisitions are created, shop floor control activity is started.

  1. Formal shop-floor control systems are unnecessary under JIT? (True/False)

True. Shop floor control is defined as a software system comprising of tools and methods that are utilized to track, schedule and report on the work progress in a manufacturing facility. A formal shop floor activity is majorly unnecessary under the JIT process as JIT involves ordering the inventory just at the time

  1. A visual representation of the scheduling process can be provided by _________ charts.

A Gantt Chart is defined as a bar chart that is useful in understanding project scheduling. It provides a visual picture of the scheduling process. It lists time intervals in scheduling on the horizontal axis of the chart and tasks required to be performed on the vertical axis of the chart.

  1. The TOC scheduling process is called ______-_________-_________.

The TOC schedule process is called Drum-Buffer-Rope.

  1. In TOC scheduling, buffers are maintained before and after _____________ resources.

In TOC scheduling, buffers are maintained before and after bottleneck resources.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1. Production activity control (PAC) actions take place mainly in which section of the MPC system?

Ans: Primary activities of MPC systems are

  1. Production Planning
  2. Implementation and contol
  3. Inventory Management

PAC falls under Implementation and control section, where it involves in day to day production operations for specific units, resources and by controlling the desired output without any deviations.

2.The shop-floor control system is kept current on changes in material plans by the MRP system? (True/False)

Ans: True, today business operations is highly volatile in nature and it effects upstream and downstream fulfillment process like supplier for sourcing and customer demand needs to be considered for production operations inorder to aviod additional inventories, so shop-floor systems are flexible enough to make necessary changes.

3.Formal shop-floor control systems are unnecessary under JIT? (True/False)

Ans: Ture,The concept of Just In Time relys highly on real time information, where formal shop-floor system is developed on the basis of manual intervention so it is not necessary for JIT.

4.A visual representation of the scheduling process can be provided by _________ charts.

Ans: Gannt Chart is the visual representation of scheduling process which is displayed in Bars with activities and dependencies.

5.The TOC scheduling process is called ______-_________-_________.

Ans: Drum-Buffer -Rope is the TOC scheduling process

6.In TOC scheduling, buffers are maintained before and after _____________ resources.

Ans: Buffers are to be maintaineted before the Protected resources.

Add a comment
Know the answer?
Add Answer to:
Production activity control (PAC) actions take place mainly in which section of the MPC system? Because...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun...

    please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun 28, 2019 at 11:59 PM Please read the article titled Evolution of Operations Planning and Control: from production to supply chains In at least three paragraphs, describe how and why the focus of operations planning and control has changed over time. While one might argue that answers consisting of sentences quoted from articles do not represent plagiarism, I do not consider them acceptable, and...

  • please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun...

    please read instructions on the first picture and follow it Discussion Board: Chapter 1 Due: Jun 28, 2019 at 11:59 PM Please read the article titled Evolution of Operations Planning and Control: from production to supply chains In at least three paragraphs, describe how and why the focus of operations planning and control has changed over time. While one might argue that answers consisting of sentences quoted from articles do not represent plagiarism, I do not consider them acceptable, and...

  • THE BIG D COMPANY The Big D Company of Dallas, Texas, was a family owned, conservatively...

    THE BIG D COMPANY The Big D Company of Dallas, Texas, was a family owned, conservatively managed company. For over forty years the company enjoyed slow, steady growth in reaching its current employment level of just over 200. All expansions were financed entirely out of earnings. As the company grew, its operating procedures were periodically re-examined and modified to cope with the complex problems that accompany growth. The company developed, manufactured, and sold metering and flow control devices used in...

  • THE BIG D COMPANY The Big D Company of Dallas, Texas, was a family owned, conservatively...

    THE BIG D COMPANY The Big D Company of Dallas, Texas, was a family owned, conservatively managed company. For over forty years the company enjoyed slow, steady growth in reaching its current employment level of just over 200. All expansions were financed entirely out of earnings. As the company grew, its operating procedures were periodically re-examined and modified to cope with the complex problems that accompany growth. The company developed, manufactured, and sold metering and flow control devices used in...

  • Question 1 0.4 pts The overall role of an operations manager is to: Control quality Schedule...

    Question 1 0.4 pts The overall role of an operations manager is to: Control quality Schedule deliveries Collect and organize shipments Convert inputs (raw materials) into outputs (goods or services) Question 2 0.4 pts Swisher cigar factory makes little cigars and big cigars on the same machine. This is an example of using: CAD CAM CIM FMS Question 3 0.4 pts The software system that determines the steps needed to produce a component and instructs the machines that do the...

  • RADICO’S CHALLENGE The executive staff at Radico Corporation was quite pleased with the one-day training program...

    RADICO’S CHALLENGE The executive staff at Radico Corporation was quite pleased with the one-day training program they attended on the benefits of using agile and Scrum on some of their projects. Radico provided products and services to both public and private sector clients, almost all of it through competitive bidding. IT was not required for any of the products and services Radico provided. Agile and Scrum had proven to be successful on internal IT projects, but there were some concerns...

  • Summary should briefly analyze the central problems and issues of the case and provide some analysis...

    Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...

  • I have this case study to solve. i want to ask which type of case study...

    I have this case study to solve. i want to ask which type of case study in this like problem, evaluation or decision? if its decision then what are the criterias and all? Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT