Question

A car has four identical main wheels (with a failure rate of 0.05 each), and a...

A car has four identical main wheels (with a failure rate of 0.05 each), and a spare wheel (with failure rate of 0.07). Due to degradation, the spare wheel has a failure rate that occurs while the wheel is not in use of 0.003. Find the expected time of failure of the car due to the wheels.

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A car has four identical main wheels (with a failure rate of 0.05 each), and a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The four wheels of a car are rotating with an angular velocity of 6.04 rad/s and...

    The four wheels of a car are rotating with an angular velocity of 6.04 rad/s and each wheel has a moment of inertia of 15.1 kg*m^2. What is the total rotational kinetic energy of the four wheels?

  • The car shown in the figure has mass m(this includes the mass of the wheels). The wheels have radius r, mass mw, and m...

    The car shown in the figure has mass m(this includes the mass of the wheels). The wheels have radius r, mass mw, and moment of inertia I=kmwr2. Assume that the axles apply the same torque ? to all four wheels. For simplicity, also assume that the weight is distributed uniformly so that all the wheels experience the same normal reaction from the ground, and so the same frictional force. Part A If there is no slipping, a frictional force must...

  • A 811 kg car has four 13.1 kg wheels. When the car is moving, what fraction...

    A 811 kg car has four 13.1 kg wheels. When the car is moving, what fraction of the total kinetic energy of the car is due to rotation of the wheels about their axles? Assume that the wheels have the same rotational inertia as uniform disks of the same mass and size. Number No units 0.0323 Units the tolerance is +/-2% Open Show Work Click if you would like to Show Work for this question:

  • A toy car has a 50g body and four solid wheels, each with a mass of...

    A toy car has a 50g body and four solid wheels, each with a mass of 5g and a radius of 7 mm. The car rolls down a horizontal track at 2 m/s, and at the end of the track it runs into a spring. If the car compresses the spring by 1 cm before bouncing back, what is the spring’s spring constant? Answer: 2400 N/m

  • 20,000 assign to each product line, the two products: car wheals and truck wheels. To determine...

    20,000 assign to each product line, the two products: car wheals and truck wheels. To determine theamr controller, Robert Hermann, has developed the follown Estimated wheels produced Direct labor hours per wheel Car 40,000 Truck 10,000 3 Total estimate d overhead costs for the two product lines are $770,000. Instructions (a) Compute the overhead cost assigned to the car wheels and truck wheels, a assuming that direct labor hours he believes that most is used to allocate overhead costs. (b)...

  • 5. A car engine powers two front wheels, producing one tire revolution for every four crankshaft...

    5. A car engine powers two front wheels, producing one tire revolution for every four crankshaft revolutions. If the car is moving at 72 mph and has 27 inch diameter tires, what video frame rate would show a mark on one tire as stationary? Would the engine pistons appear stationary if recorded at the same frame rate (assuming the engine block is transparent)? Assume engine drives wheel without any slip.

  • Compute the cost that is assigned to the car wheels and truck wheels product lines using...

    Compute the cost that is assigned to the car wheels and truck wheels product lines using an activity-based costing system, given the following information. Estimated Use of Cost Drivers per Product Car Truck Number of setups Direct labor hours 200 40,000 100 800 27,000 1.100 Number of inspections Car Wheels Truck Wheels Setting up machines $ Assembling Inspection Total cost assigned Altex Inc. manufactures two products: car wheels and truck wheels. To determine the amount of overhead to assign to...

  • Altex Inc. manufactures two products: car wheels and truck wheels. To determine the amount of overhead...

    Altex Inc. manufactures two products: car wheels and truck wheels. To determine the amount of overhead to assign to each product line, the controller, Robert Hermann, has developed the following information. Car Truck Estimated wheels produced Direct labor hours per wheel 39,000 11,000 1 3 Total estimated overhead costs for the two product lines are $835,200. ✓ Your answer is correct. Calculate overhead rate. (Round answer to 2 decimal places, e.g. 12.25.) Overhead rate $ 11.60 per direct labor hour...

  • Exercise 17-4 Altex Inc. manufactures two products: car wheels and truck wheels. To determine the amount...

    Exercise 17-4 Altex Inc. manufactures two products: car wheels and truck wheels. To determine the amount of overhead to assign to each product line, the information controller, Robert Hermann, has developed the following Car Truck Estimated wheels produced Direct labor hours per wheel 35,500 15,000 Total estimated overhead costs for the two product lines are $825,000 Calculate overhead rate. (Round answer to 2 decimal places, e-g. 12.25.) Overhead rate per direct labor hour Compute the overhead cost assigned to the...

  • Another system composes of four items and each one of these items has constant failure rate of 0....

    Another system composes of four items and each one of these items has constant failure rate of 0.0008 failures per hour. These items when they work the system will work. However, when any one of the system's items fails, the whole system will come to a complete halt. Calculate the following: 1. The reliability of the system at 2000 hour running time? 2. The system hazard rate? 3. Mean time to failure of the system?

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT