the tool that is useful in documenting the current process is:
a. a control chart
b. a pareto chart
c. a check sheet
d. a flow chart
e. a simo chart
d. a flow chart
A flow chart is a tool that is used in order to document the current process through visual or graphical representation. It actually present the overall sequence of events and the conditions that need to be fulfilled for better impact accordingly.
the tool that is useful in documenting the current process is: a. a control chart b....
18. The quality tool which helps focus on the most important problem areas based on the 80-20 rule is: A. brainstorming. B. check sheets. C. Pareto analysis. D. cause-and-effect diagrams. E. fail-safe methods. 19 A control chart used to monitor the process mean is the: A. p-chart. B. R-chart. C. x-bar chart. D. c-chart EGantt chart 20. The range chart (R-chart) is most likely to detect a change in: A. proportion. B mean. C. number defective. D. variability. E sample...
Which of the following statements is NOT part of the purpose of a control chart? A: Tool to control variation in the process B: Tool to improve process performance C: Tool to meet customer specifications D: Tool to monitor process behavior
Which of the following is a simple TOM tool for recording the reasons a process may not be performing as expected? Pareto Analysis Flowcharts (process chart) Check sheets Scatter diagrams
Which option is correct? a. GRAPH b. histogram c. pareto diagram d. scater diagram e. cause and effect f. control chart g. check sheet . The supervisor would like to monitor the frequency of defects occurring in the packing process.
Which option is correct? a. GRAPH b. histogram c. pareto diagram d. scater diagram e. cause and effect f. control chart g. check sheet The manager wants to know if the bottling process is stable in terms of bottle contents.
7. How can each of the following be used to improve productivity? (a) Operation process chart (b) Flow process chart (c) Flow diagram (d) Left-hand/right-hand chart (e) Multiple activity chart 7. How can each of the following be used to improve productivity? (a) Operation process chart (b) Flow process chart (c) Flow diagram (d) Left-hand/right-hand chart (e) Multiple activity chart
A. Process capability (acceptance sampling) is: B. A process is out of control/ or in control when: C. When does productivity increase/ decrease? D. What action should be taken if a plotted value falls below the lower control limit on a process control chart? E. What are some implicit/ explicit components of a service delivery system? F. Each day for two workweeks (10 days total), George weighs x bags from that day’s production. If the average of the means is...
Which option is correct? a. GRAPH b. histogram c. pareto diagram d. scater diagram e. cause and effect f. control chart g. check sheet h. Radar chart . The QA manager wouild like to determine the Dest supplier of PVC compound used for the manufacturing of plastic tubes
A control chart is to be established on a process producing refrigerators. The inspection unit is one refrigerator, and a common chart for nonconformities is to be used. As preliminary data, 16 nonconformities were counted in inspecting 30 refrigerators. (a) What are the three-sigma control limits? (b) What is the α-risk for this control chart? (c) What is the β-risk if the average number of defects is actually 2 (i.e., if c = 2.0)? (d) Find the average run length...