A curved highway has only one lane with a centerline radius of 800 ft. A building...

A curved highway has only one lane with a centerline radius of 800 ft. A building is located 25 ft. from the centerline. The road is level. Take the coefficient of braking friction as 0.36 and perception-reaction time as 2.5 seconds.

A.Determine the appropriate speed limit on the curve to ensure stopping sight distance

B.Determine the rate of super-elevation (assume that the coefficient of side frictionis0.15)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

​​​​​​

Add a comment
Know the answer?
Add Answer to:
A curved highway has only one lane with a centerline radius of 800 ft. A building...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A horizontal curve forms part of a four-lane highway that has a posted speed limit of...

    A horizontal curve forms part of a four-lane highway that has a posted speed limit of 40 mph. The lane width is 12 ft and the radius of the horizontal curve equals 1000 ft at the highway centerline. Determine the minimum distance a large billboard can be placed from the centerline of the inside lane of the curve, without reducing the required stopping sight distance. (Use default values of reaction time and vehicle deceleration).

  • 2) A 6-lane divided highway has a design speed of 65 mph and the following typical...

    2) A 6-lane divided highway has a design speed of 65 mph and the following typical section: Grassed median: Median shoulders: Lanes: Right-side shoulders: 14 ft. wide 4ft. wide 12 ft. wide, 3 lanes directional 10 ft. wide Centerline Degree of Curvature, D is 3 45 If single face concrete barrier be installed along the highway without encroaching on the required horizontal sight distance, how far (at minimum) from the roadway centerline should the face of the barrier be located?

  • 2) A 6-lane divided highway has a design speed of 65 mph and the following typical...

    2) A 6-lane divided highway has a design speed of 65 mph and the following typical section: Grassed median: Median shoulders: Lanes: Right-side shoulders: Centerline Degree of Curvature, D is 3 45 14 ft. wide 4ft. wide 12 ft. wide, 3 lanes directional 10 ft. wide If single face concrete barrier be installed along the highway without encroaching on the required horizontal sight distance, how far (at minimum) from the roadway centerline should the face of the barrier be located?

  • Problem 4. A section of a two-lane highway has 12-ft lanes and a design speed of...

    Problem 4. A section of a two-lane highway has 12-ft lanes and a design speed of 75 mi/h. The section contains a vertical curve and a horizontal curve. The vertical curve connects a-2.5% grade and a +1.5% grade. The PVT of this vertical curve is at station 36 + 50. The PC of the horizontal curve is located 294 ft before the PVC of the vertical curve. The horizontal curve has superelevation of 8% and central angle of 38 degrees....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT