As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs.
Job 102 | Job 103 | Job 104 | |||||||
Direct materials | $ | 31,000 | $ | 56,000 | $ | 57,000 | |||
Direct labor | 19,000 | 25,300 | 43,000 | ||||||
Overhead applied | 7,410 | 9,867 | 16,770 | ||||||
Job 102 was started in production in May and the following costs
were assigned to it in May: direct materials, $14,000; direct
labor, $3,500; and overhead, $1,365. Jobs 103 and 104 were started
in June. Overhead cost is applied with a predetermined rate based
on direct labor cost. Jobs 102 and 103 were finished in June, and
Job 104 is expected to be finished in July. No raw materials were
used indirectly in June. Using this information, answer the
following questions. (Assume this company’s predetermined overhead
rate did not change across these months.)
1&2. Complete the table below to calculate the
cost of the raw materials requisitioned and direct labor cost
incurred during June for each of the three jobs?
3. Using the accumulated costs of the jobs, what
predetermined overhead rate is used?
4. How much total cost is transferred to finished
goods during June?
1) and 2) | ||||
Cost of raw materials requisitioned in June | ||||
Job 102 | 31000 | |||
Job 103 | 56000 | |||
Job 104 | 57000 | |||
Cost of raw materials requisitioned in June | 144000 | |||
Direct labor cost incurred in June | ||||
Job 102 | 19000 | |||
Job 103 | 25300 | |||
Job 104 | 43000 | |||
Direct labor cost incurred in June | 87300 |
3) | |||
The predetermined overhead rate used in June | |||
7410/19000 | |||
39% of direct labor cost |
4) | |||
job 102 | job 103 | ||
Beginning work in progress | 18865 | ||
Cost added during the year | |||
Direct materials | 31000 | 56000 | |
Direct labor | 19000 | 25300 | |
Applied overhead | 7410 | 9867 | |
total cost added during the year | 57410 | 91167 | |
Total cost | 76275 | 91167 | 167442 |
Total cost transferred to finished goods during June is 167442 |
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the...
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. JOD 102 922,000 Diegt materials Direct labor Overhead applied JOB 103 $71,000 27.300 10.920 JOD 104 $55,000 41.000 16.400 Job 102 was started in production in May and the following costs were assigned to it in May: direct materials, $11.000; direct labor, $3,900; and overhead, $1,560. Jobs 103 and 104 were started in June. Overhead cost...
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. Job 102 $16,000 20,000 9,200 Job 103 Job 104 Direct materials $56,000 $60,000 44,000 20,240 Direct labor 30,000 Overhead applied 13,800 Job 102 was started in production in May, and the following costs were assigned to it in May: direct materials, $11,000; direct labor, $3,900; and overhead, $1,794. Jobs 103 and 104 were started in June....
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs ts Direct materials Direct labor Overhead applied Job 102 $18,000 14,000 6,020 Job 103 $51,000 26,200 11, 266 Job 104 $64,000 43,090 18,490 Job 102 was started in production in May, and the following costs were assigned to it in May: direct materials, $14,000; direct labor, $4,000; and overhead, $1,720. Jobs 103 and 104 were started...
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. Direct materials Direct labor Overhead applied Job 102 $38,000 13,000 5,280 Job 103 $56,000 25,600 10,240 Job 104 $58,000 41,000 16,480 Job 102 was started in production in May and the following costs were assigned to it in May direct materials, $12,000, direct labor $3,300, and overhead, $1,320. Jobs 103 and 104 were started in June....
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. Direct materials Direct labor Overhead applied Job 102 $17,000 16,000 5,280 Job 103 $53,000 27,100 8,943 Job 104 $53,000 40,000 13,200 Job 102 was started in production in May and the following costs were assigned to it in May: direct materials. $8,000; direct labor. $2,900; and overhead, $957. Jobs 103 and 104 were started in June....
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. Job 102 Job 103 Job 104 Direct materials $ 43,000 $ 65,000 $ 52,000 Direct labor 17,000 29,600 46,000 Overhead applied 7,480 13,024 20,240 Job 102 was started in production in May and the following costs were assigned to it in May: direct materials, $11,000; direct labor, $3,900; and overhead, $1,716. Jobs 103 and 104 were...
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. Job 102 Job 103 Job 104 Direct materials$25,000 $49,000 $55,000 Direct labor 17,000 25,400 40,000 Overhead applied 7,650 11,430 18,000 Job 102 was started in production in May and the following costs were assigned to it in May direct materials. $9.000 direct labor $3,200, and overhead. 51.440. Jobs 103 and 104 were started in June. Overhead...
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. Direct materials Direct labor Overhead applied Job 102 $27,000 17,000 6,120 Job 103 $58,000 25,600 9,216 Job 104 $63,000 43,000 15,480 Job 102 was started in production in May, and the following costs were assigned to it in May: direct materials, $12,000; direct labor, $3,000; and overhead, $1,080. Jobs 103 and 104 were started in June....
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. Direct materials Direct labor Overhead applied Job 102 $39,000 13,000 5,070 Job 103 $61,000 27,700 10,803 Job 104 $62,000 40,000 15,600 Job 102 was started in production in May, and the following costs were assigned to it in May: direct materials, $10,000; direct labor, $3,400; and overhead, $1,326. Jobs 103 and 104 were started in June....
As of the end of June, the job cost sheets at Racing Wheels, Inc., show the following total costs accumulated on three custom jobs. Direct materials Direct labor Overhead applied Job 102 $26,000 20,000 6,800 Job 103 $55,000 27,200 9,248 Job 104 $55,000 42,000 14,280 Job 102 was started in production in May, and the following costs were assigned to it in May: direct materials, $14,000; direct labor, $3,100; and overhead, $1,054. Jobs 103 and 104 were started in June....