the determinstic rate of arrival of vehicles at a parking garage having a single toll booth is A (t) =6.1-0.22t where A(t) is in vehicle per minute and t is in minute after the parking lot has opened.what should be the minimium constant departure rate needed after the opening of the parking lot to ensure that the queue length doesnt exceed 10 vehivles
Solution:
Answer:
The minimum constant departure rate needed after the opening of the parking lot to ensure that the queue length doesn't exceed 10 vehicles is 4 vehicles/minute .
Detailed solution is provided in the images below.
Please go through it and if you have any doubts, feel free to ask.
the determinstic rate of arrival of vehicles at a parking garage having a single toll booth...
Problem 2 (20 points) Vehicles begin to arrive at a parking lot after the start of arriving at a deterministic but time t is in minutes]. A single parking lot attendant processes vehicles (assigns will back up onto fees) at a deterministic rate at the station. A queue exceeding four congested street, and is to be avoided. a major sporting event. They are 3.3-0.1t [where A(t) is in veh/ min and varying rate A(t) vehicles will back up onto a...
arrival rate function (in vehicles per minute) of X(t) = 4 -0.02t, where t is in minutes. At 7:40 A.M. the parking lot opens and processes vehicles at a rate of 10 per minute. a) (7%) What is the average delay per vehicle? b) (8%) What is the maximum queue? c) (8%) What is the waiting time of 20th vehicle arrives at the parking lot?
Suppose vehicles arrive at a single toll booth according to a Poisson process with a mean arrival rate of 8.4 veh/min. Their service times are exponentially distributed. The mean processing rate is 10 veh/min. a. What is the value of the utilization ratio? b. What is the average length of the queue? c. What is the average waiting time in the queue? d. What is the average time spent in the system?
5- In a national park in Texas, vehicles begin to arrive at a parking lot at 7:30 A.M. with an arrival rate function (in vehicles per minute) of (t) = 4 -0.02t, where t is in minutes. At 7:40 A.M. the parking lot opens and processes vehicles at a rate of 10 per minute. a) (7%) What is the average delay per vehicle? b) (8%) What is the maximum queue? c) (8%) What is the waiting time of 20th vehicle...
5- In a national park in Texas, vehicles begin to arrive at a parking lot at 7:30 A.M. with arrival rate function (in vehicles per minute) of (t) = 4 - 0.02t, where t is in minutes. 7:40 A.M. the parking lot opens and processes vehicles at a rate of 10 per minute. a) (7%) What is the average delay per vehicle? b) (8%) What is the maximum queue? c) (8%) What is the waiting time of 20th vehicle arrives...
5- In a national park in Texas, vehicles begin to arrive at a parking lot at 7:30 A.M. with an arrival rate function (in vehicles per minute) of (t) = 4 -0.02t, where t is in minutes. At 7:40 A.M. the parking lot opens and processes vehicles at a rate of 10 per minute. a) (7%) What is the average delay per vehicle? b) (8%) What is the maximum queue? c) (8%) What is the waiting time of 20th vehicle...
5- In a national park in Texas, vehicles begin to arrive at a parking lot at 7:30 A.M. with an arrival rate function (in vehicles per minute) of (t) = 4 - 0.02t, where t is in minutes. At 7:40 A.M. the parking lot opens and processes vehicles at a rate of 10 per minute. a) (7%) What is the average delay per vehicle? b) (8%) What is the maximum queue? c) (8%) What is the waiting time of 20th...
5- In a national park in Texas, vehicles begin to arrive at a parking lot at 7:30 A.M. with an arrival rate function (in vehicles per minute) of λ(t) = 4 - 0.02t, where t is in minutes. At 7:40 A.M. the parking lot opens and processes vehicles at a rate of 10 per minute. a) (7%) What is the average delay per vehicle? b) (8%) What is the maximum queue? c) (8%) What is the waiting time of 20th...
time sensitive. In a national park in Utah, vehicles begin to arrive at a parking lot at 7:30 A.M. with an arrival rate function (in vehicles per minute) of (t) = 4 -0.02t, where t is in minutes. At 7:40 A.M. the parking lot opens and processes vehicles at a rate of 10 per minute. a) What is the average delay per vehicle? b) What is the maximum queue? c) What is the waiting time of 20th vehicle arrives at...
5- In a nationalpark in Texas, vehicles begin to arrive at a parking lot at 7:30 A.M. with an arrival rate function (in vehicles per minute) of (t) = 4 -0.02t, where t is in minutes. At 7:40 A.M. the parking lot opens and processes vehicles at a rate of 10 per minute. a) (7%) What is the average delay per vehicle? b) (8%) What is the maximum queue? c) (8%) What is the waiting time of 20 vehicle arrives...