1. Suppose that you are designing an overhead transmission line that would operate in a polluted environment. Explain the procedure for selecting the appropriate insulators and their dimensions. 2...
(a) Briefly explain how corona discharge takes place in overhead transmission line systems (b) What accounts for the unequipotential distribution along a string of insulators? How can it be practically resolved? (c) A 3-phase 220 kV 50 Hz transmission line consists of 1.5 cm radius spaced 1.8 m apart in an equilateral triangle formation. If the temperature is 360 C and the atmospheric pressure is 76 cm Hg, and assume the breakdown strength of air to be 32 kV/cm (peak...
How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...