4. (5 Points) Control charts are to be kept on the thickness measurements for the process that produces steel tubing. The current specifications on the tubing are 0.1340 +0.0010 inch. After colle...
4. (5 Points) Control charts are to be kept on the thickness measurements for the process that produces steel tubing. The current specifications on the tubing are 0.1340 +0.0010 inch. After collecting 25 rational samples of size n 4 measurements at approxi half-hour intervals, the data were used to determine the sum of sample averages as 4.014 inches and the sum of sample ranges as 0.027 inch. Using X-bar and R control charts the process was declared in-control. Assume that the quality characteristic is normally distributed. Construct a 95% confidence interval for estimating the potential capability (Cp) for this process.
4. (5 Points) Control charts are to be kept on the thickness measurements for the process that produces steel tubing. The current specifications on the tubing are 0.1340 +0.0010 inch. After collecting 25 rational samples of size n 4 measurements at approxi half-hour intervals, the data were used to determine the sum of sample averages as 4.014 inches and the sum of sample ranges as 0.027 inch. Using X-bar and R control charts the process was declared in-control. Assume that the quality characteristic is normally distributed. Construct a 95% confidence interval for estimating the potential capability (Cp) for this process.