this is from book mold flow design. please solve this. will give thumbs up. 1. a An injection molder has received an order of 500,000 plastie parts. The time available CLO- for supplying the parts...
1. a An injection molder has received an order of 500,000 plastie parts. The time available CLO- for supplying the parts is 3 month and the cycle time for the production of a set of parts is 5 minutes. Assuming a reject rate of 5 % please describe a strategy to supply the demand successfully in terms of number of cavities and production shifts? There are two identical machines available for this job. [61 CLO-1
1. a An injection molder has received an order of 500,000 plastie parts. The time available CLO- for supplying the parts is 3 month and the cycle time for the production of a set of parts is 5 minutes. Assuming a reject rate of 5 % please describe a strategy to supply the demand successfully in terms of number of cavities and production shifts? There are two identical machines available for this job. [61 CLO-1