Question

Can you help me calculating this question? Thank you.

(6) The following table shows the readings of the kWh meter of a factory for 8 hours. The ratings of all of the loads in the

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Eneryyonumud Kwh 1:30 t t o 210 1 00 310 450 S 02:30 6 20 | 03, σ。 2 30 850 2 SO T 3: 36 3 SO orrerpanding to maimum diman I800.9 50 eneray frctual ponter t & hours cnsume in 30 da, E,x30 Total enunat Um contract ed capaciby, P2-tooo xob5-760 111000

Add a comment
Know the answer?
Add Answer to:
Can you help me calculating this question? Thank you. (6) The following table shows the readings of the kWh meter of a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question (2) [10 Marks] Meter Charge: $760/billing period Energy Charge $0.06 for the first 100,000 kwh...

    Question (2) [10 Marks] Meter Charge: $760/billing period Energy Charge $0.06 for the first 100,000 kwh $0.07 for the next 300,000 kWh $0.08 for all remaining kwh $6.5 per kw demand charge per billing period. Peak demand charges are leveled on customers only during the peak demand period which is from 8:00 AM to 6:00 PM Weekdays A 20% energy charge fee is added to the total energy charges (energy only) if the power factor of the plant is below...

  • Can you help me calculating this question? Thank you. Can you calculate this working and explain why? Thank you! 1. A 5...

    Can you help me calculating this question? Thank you. Can you calculate this working and explain why? Thank you! 1. A 50-Hz 10-MVA, 66/22-kV distribution transformer has a full-load efficiency of 98% at 0.8 lagging power factor. The transformer core loss is 80 kW. The transformer supplies an industrial load that has a constant demand of 5000 kW at 0.65 lagging power factor. The cost of energy is S0.1 per kWh. In the following questions, assume that the voltage at...

  • You are the energy manager for a food company that operates 5 milk cheese processing facilities. ...

    You are the energy manager for a food company that operates 5 milk cheese processing facilities. The owners have asked you to evaluate aggregating the usage of the 5 facilties together and putting out a RFP (Request for Proposals) to energy providers to bid on supplying the power for all 5 of the facilities as a single contract for one year to see if they can lower the electricity cost. Each facility has identical demand pattems as follows (one facility)...

  • Can someone help fill in the blanks? Thank you! The following table shows the number of...

    Can someone help fill in the blanks? Thank you! The following table shows the number of hours between sunrise and sunset for different locations on Earth on both solstices (June 21 & December 21) and equinoxes (March 21 & September 21). Latitude March 21 June 21 September 21 December 21 Equator 12 12:07 12 12:08 10° N 12 12:43 12 11:33 20° N 12 13:21 12 10:54 30° N 12 14:05 12 10:13 40° N 12 15:01 12 9:20 50°...

  • Can you help me to solve question B4 , please:) please B1. (a) A DC circuit...

    Can you help me to solve question B4 , please:) please B1. (a) A DC circuit is shown in Figure Bl. 1092 B A 802 702 1402 18V Figure B1 Calculate (i) the total resistance across A and B (RT); (5 marks) (11) the total current from the DC supply (Is); (3 marks) (111) the potential difference(p.d.) across the 1422 resistor (V149); (2 marks) (iv) the current flowing through 1022 (11092); (3 marks) (v) the power dissipated by RI (PT)...

  • Plu-15% oftat "mont Truter, R U, wlho eollected pay the local TDSP You are the enmergy mannger fo...

    Column FHeadings Month Name, kWh/facility, Total kWh for 5 Facilities/Month 4. Using a spreadsheet, figure out how much money the TDSP charge is each month (Jan, Feb, March, etc) for the 5 facilities in total. Column Headings Month Name, Customer Charge, Peak Charge, Energy Charge, Sales Tax, Total (S) 5. Using a spreadsheet, calculate the amount of the energy/generation portion of the bill only (not TDSP charges) for each month of the year (Jan, Feb, March, etc) for the following...

  • Need help with Questions 6-8 specifically number 8. Here is what I've got for question 4...

    Need help with Questions 6-8 specifically number 8. Here is what I've got for question 4 which needs to be modified to answer question 8. This is what I got so far for questions 6-8 Please help me modify 8. Also do note that the first statement is 6 then the second is 7 and the last statement that is highlighted is question 8 in the following screencap: 1 List all project names and manager names in charge projects. 2...

  • Can you help me with #15, 34, 35, 37, 38, 42, 45, 48, 49 and 50:...

    Can you help me with #15, 34, 35, 37, 38, 42, 45, 48, 49 and 50: close the revenue account, 51: close the expense accounts, 52: close the dividend account. THANK YOU 02. December 3: Byte purchased a Ricoh Color Copier for $5,000.00. The invoice number was 61298. Byte paid 10% in cash and signed a three-year note for the remaining balance. Interest at a rate of 6% a year will be paid semiannually. 03. December 3: Check # 6001...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT