Activity | Cost | Cost Driver | Quantity | Cost per cost driver |
Material Acquisition and Inspection | $ 68,000.00 | Amount of Direct Materials Cost | $ 200,000.00 | $ 0.34 |
Materials Movement | $ 19,600.00 | Number of Batch Moves | 140 | $ 140.00 |
Scheduling | $ 43,400.00 | Number of Batches | 70 | $ 620.00 |
Allocation of Manufacturing Overhead | ||
Activity | Gas Cooker | Charcoal Smoker |
Material Acquisition and Inspection | $ 23,800.00 | $ 44,200.00 |
Materials Movement | $ 12,600.00 | $ 7,000.00 |
Scheduling | $ 31,000.00 | $ 12,400.00 |
Total Manufacturing Overhead | $ 67,400.00 | $ 63,600.00 |
Direct Material | $ 70,000.00 | $ 130,000.00 |
Direct Labor | $ 44,000.00 | $ 56,000.00 |
Total Manufacturing Cost | $ 181,400.00 | $ 249,600.00 |
Units | 2000 | 8000 |
Manufacturing Cost per unit | $ 90.70 | $ 31.20 |
Working
Allocation of Manufacturing Overhead | ||
Activity | Gas Cooker | Charcoal Smoker |
Material Acquisition and Inspection | =70000*0.34 | =130000*0.34 |
Materials Movement | =90*140 | =50*140 |
Scheduling | =50*620 | =20*620 |
total and per unit costs using activity-based costing Gas Cooker 2,000 50 Charcoal Smoker 8,000 20 Units Number of...
D2,3,4 E18-22. Activity-Based Costing and Conventional Costs Compared Hickory Grill Company manufactures two types of cooking grills: the Gas Cooker and the Charcoal Smoker. The Cooker is a premium product sold in upscale outdoor shops: the Smoker is sold in major discount stores. Following is information pertaining to the manufacturing costs for the cur- rent month. Charcoal Smoker Gas Cooker 2,000 8,000 Units ................................................... Number of batches........... Number of batch moves.......... Direct materials............ Direct labor..... .. 50 90 $70,000 $44,000...
C18-20). E18-22. Activity-Based Costing and Conventional Costs Compared Hickory Grill Company manufactures two types of cooking grills: the Gas Cooker an Smoker. The Cooker is a premium product sold in upscale outdoor shops: the Sma major discount stores. Following is information pertaining to the manufacturing ce rent month. Cooker and the Charcoal the Smoker is sold in nufacturing costs for the cur- Gas Cooker Units........ Number of batches........ Number of batch moves... Direct materials ... Direct labor.. 2,000 50 90...
E18-22. Activity-Based Costing and Conventional Costs Compared Hickory Grill Company manufactures two types of cooking grills: the Gas Cooker and the Charcoal Smoker. The Cooker is a premium product sold in upscale outdoor shops; the Smoker is sold in major discount stores. Following is information pertaining to the manufacturing costs for the current month Manufacturing overhead follows: a. Determine the total and per-unit costs of manufacturing the Gas Cooker and Charcoal Smoker for the month, assuming all manufacturing overhead is...
Question 2 PFlag question Not complete Marked out of 6.00 Activity-Based Costing and Conventional Costs Compared Chef Grill Company manufactures two types of cooking grills: the Gas Cooker and the Charcoal Smoker. The Cooker is a premium product sold in upscale outdoor shops; the Smoker is sold in major discount stores. Following is information pertaining to the manufacturing costs for the current month. Gas Cooker Charcoal Smoker Units 1,000 3,000 Number of batches 20 10 Number of batch moves 80...
Activity-Based Costing and Conventional Costs Compared Hickory Grill Company manufactures two types of cooking grills: the Gas Cooker and the Charcoal Smoker. The Cooker is a premium product sold in upscale outdoor shops; the Smoker is sold in major discount stores. Following is information pertaining to the manufacturing costs for the current month. Gas Cooker Charcoal Smoker Units 1,000 5,000 Number of batches 50 10 Number of batch moves 80 20 Direct materials $80,000 $140,000 Direct labor $20,000 $25,000 Manufacturing...
Activity-Based Costing and Conventional Costs Compared Chef Grill Company manufactures two types of cooking grills: the Gas Cooker and the Charcoal Smoker. The Cooker is a premium product sold in upscale outdoor shops; the Smoker is sold in major discount stores. Following is information pertaining to the manufacturing costs for the current month. Gas Cooker Charcoal Smoker Units 1,000 7,000 Number of batches 40 Number of batch moves 80 Direct materials $50,000 $100,000 Direct labor $20,000 $28,000 10 20 Support...
Activity-Based Costing and Conventional Costs Compared Hickory Grill Company manufactures two types of cooking grills: the Gas Cooker and the Charcoa Smoker. The Cooker is a premium product sold in upscale outdoor shops; the Smoker is sold in major discount stores. Following is information pertaining to the manufacturing costs for the cur- rent month. Charcoal Smoker Gas Cooker 8,000 2,000 Units..... 20 50 Number of batches. 50 90 Number of batch moves.. Direct materials.... Direct labor.... $130,000 $56,000 $70,000 $44,000...
help please, check work as needed :( Prir Question 6 Answer saved Marked out of 1.00 p Flag question Activity-Based Costing god Conventional Costs Compared Chef Grill Company manufactures two types of cooking grills: the Gas Cooker and the Charcoal Smoker. The Cooker is a premium product sold in upscale outdoor shops; the Smoker is sold in major discount stores. Following is information pertaining to the manufacturing costs for the current month. Units Number of batches Number of batch moves...
Customer Profitability Analysis Roland, Inc. provides residential painting services for three home building companies, Alpha, Beta, and Gamma, and it uses a job costing system for determining the costs for completing each job. The job cost system does not capture any cost incurred by Roland for return touchups and refinishes after the homeowner occupies the home. Roland paints each house on a square footage contract price, which includes painting as well as all refinishes and touchups required after the homes...
Total Activity-Based Costing Steampunk Corporation has the following predicted indirect costs and cost drivers for 2019 for the given activity cost pools: Fabrication Finishing Department Department Cost Driver Maintenance $ 24,000 12,000 Machine hours Materials handling 36,000 18,000 Material moves Machine 84,000 6,000 Machine setups Inspections 30,000 Inspection hours $144,000 $66,000 The following activity predictions were also made for the year: Fabrication Finishing Department Department Machine hours 5,000 2,500 Material moves 1,500 750 Machine setups 350 Inspection hours 500 It...