Which of the following is a value-added activity?
Storing items.
Moving items.
Waiting for work.
Assembling items.
Solution:
Assembling items is a value added activity as this activity do some value add to the products.
Hence last option is correct.
Which of the following is a value-added activity? Storing items. Moving items. Waiting for work. Assembling item...
pany using activity-based manavement identify cach of the following activities as (V) value-added or (N) nonvalue-added. (8 Points) 1. Designing car seats to maximize comfort. 2. Storing additional materials for future production 3. Special packaging of products for safety reasons. 4. Scrapping defective production materials. 5. Assembling lawn mowers at the local hardware store. 6. Moving parts from storage to the factory for manufacturing. 25. Theron Industries has the following financial data related to its quality control program. Initial raw...
Which of the following activities is most likely to be classified as value-added for a manufacturing company? Multiple Choice Ι ο Storing ο Ordering ο inspecting ο Assembling
Identify a non-value-added activity at a grocery store, a bank, and a hotel. a. Grocery store Employing a paid staff. Making payment for inventory. Storing large amounts of inventory on hand. b. Bank Maintenance of customer profile. Maintenance of proper cash balance. Improper recording of customer transactions. c. Hotel Price hike of menu items. Long waiting line to check in to the hotel. Providing quality food.
Which of the following is not an example of a nonvalue-added activity? a. Storing b. Reporting defects c. Handling customer complaints d. Supervising production workers The primary difference between variable and absorption costing is the treatment of: fixed selling and administration costs variable selling and administrative costs fixed manufacturing overhead variable manufacturing overhead The following information was extracted from the accounting records of MVP Corporation: Selling price per unit $ 60 Variable cost per unit 20 Total fixed costs 480,000...
Anna Bellatorre Inc. is interested in using its activity-based costing system to improve its operating efficiency and its profit margins by applying activity-based management techniques. As part of this undertaking, you have been asked to classify its plant activities as value-added or non–value-added.Using the list of activities below, classify each activity as either value-added or non–value-added.(a)Designing new models Non-value addedValue-added(b)Purchasing raw materials and parts Value-addedNon-value added(c)Storing and managing inventory Value-addedNon-value added(d)Receiving and inspecting raw materials and parts Non-value addedValue-added(e)Interviewing and hiring new personnel Value-addedNon-value added(f)Machine...
Which of the following is not a unit-level activity? Sewing Purchase ordering Painting Assembling
Which of the following is not a batch-level activity! 1) Assembling 2) Inspection 3) Equipment setups 4) Purchase ordering Question 27 (2.5 points) For its inspecting cost pool, Davidson, Inc. expected overhead cost of $300,000 and 4,000 inspections. The actual overhead cost for that cost pool was $360,000 for 5,000 inspections. The activity-based overhead rate used to assign the costs of the inspecting cost pool to products is 1) $60 per inspection. 2) $72 per inspection. 3) $75 per inspection....
Value- and Non-Value Added Cost Reporting Cicleta Manufacturing has four activities: receiving materials, assembly, expediting products, and storing goods. Receiving and assembly are necessary activities; expediting and storing goods are unnecessary. The following data pertain to the four activities for the year ending 2014 (actual price per unit of the activity driver is assumed to be equal to the standard price): Activity Activity Driver SQ AQ SP Receiving Receiving orders 13,600 28,500 $24 Assembly Labor hours 117,000 142,500 1 7...
Value- and Non-Value-Added Cost Reporting Cicleta Manufacturing has four activities: receiving materials, assembly, expediting products, and storing goods. Receiving and assembly are necessary activities; expediting and storing goods are unnecessary. The following data pertain to the four activities for the year ending 20x1 (actual price per unit of the activity driver is assumed to be equal to the standard price): Activity Activity Driver SQ AQ SP Receiving Receiving orders 12,000 18,000 $21 Assembly Labor hours 75,000 90,000 15 Expediting Orders...
Which of the following is a value-added activity? engineering design machinery repair inventory storage inspections