Question

Building a LAN and WAN Assignment In this assignment, you will build a WAN and a LAN for Widgets Corporation. Using the provided Visio diagram, you need to supply the appropriate cables to interconnect the Main Office to the Factory and Warehouse. In addition, you need to show what type of cable connections will connect the offices to the IDFs. All connections must all terminate at the IDFs of each building. When designing your solution, keep in mind the distances between buildings, the type of cable you will implement, and the cost to interconnect them. If you’re unfamiliar with Visio, use this YouTube link to learn how to interconnect objects https://www.youtube.com/watch?v=bQaxxvwWgtM

You will be graded on the following:

1. Cost of solution

2. Appropriate solution

3. Neatness of diagram

200 feet Main Office 200 feet 1 mile away LL IDF Factory IDE 600 feet Warehouse 200 feet IDF 200 feet 300 feet 1,000 feet awa

0 0
Add a comment Improve this question Transcribed image text
Answer #1

NETWORK DIAGRAM OF WIDGET CORPORATION

MAIN OFFICE Internet WAN WAREHOUSE FACTORY

Cost of the above network for cable (UTP - Unshielded twisted pair cable) from Finolex company which will cost approximately 80USD for overall cable connection.The above network connection is set up based on star topology which uses Layer 3 switch at the centre which goes to IDF of three offices.The main office contains server and admin management system which will updated in the warehouse and factory.

Add a comment
Know the answer?
Add Answer to:
Building a LAN and WAN Assignment In this assignment, you will build a WAN and a LAN for Widgets Corporation. Using the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The Sunshine Health Corporation has requested you evaluate their Scottsdale, Arizona facility. The original structure was...

    The Sunshine Health Corporation has requested you evaluate their Scottsdale, Arizona facility. The original structure was built in 1965. The facility has undergone several remodels aesthetically, with no real infrastructure changes. The facility is wired with coaxial cable and RJ11 for telephone. In 1995 each office and the production facility were wired with Cat 3 cable. Much of this cabling still exists. In 2001, the executive offices were wired with Cat 5 cable. Upon inspection, none of the old cabling...

  • Deep in the woods, Orchestrated for You (OY) has a small workshop where they build stringed...

    Deep in the woods, Orchestrated for You (OY) has a small workshop where they build stringed instruments for sale to budding musicians. OY’s accountant has long used a normal costing system and applied manufacturing overhead on the basis of direct labor hours. The company’s budget for the current year includes the following predictions: Budgeted total manufacturing overhead        $5,000,000 Budgeted total direct-labor hours                      $400,000 During November, the company worked to complete the following two orders (production jobs): Job No. 334: consisting of 76...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT