Non-Conforming Parts (NCP) Presume; Production makes 250,000 Parts per year. Each Part Sells for $100. If no issues, Each Part cost $90 to make. The Critical Operation is the last operation - Unfortunately. If it’s too long – it can be reworked. If it’s too short – it’s scrap. If rework is needed, there is an additional $0.70 added to the production cost. If the part must be scrapped, there is a $6 disposal fee as it contains mercury (Hg). The Final Operation’s Critical Dimension is 100mm +/-10 mm. We have 3 (Bell Curve) Processes: FOR EACH SCENARIO; What would be the -- Percent First Time Capable within Tolerances -- Percent Rework -- Percent Scrap -- Percent between 99 mm and 101 mm -- and Profit?? 1) A Process Centered at 100mm with a Standard Deviation of +/- 5mm?? 2) A Process Centered at 105mm with a Standard Deviation of +/- 5mm? 3) A Process Centered at 100mm with a Standard Deviation of +/- 1mm? 4) A Process Centered at 100mm with a Standard Deviation of +/- 0.1mm? a. In this scenario, If it were “better” (Cost, performance, etc.) to move change the tolerances to 95mm +/- 5mm; would you be comfortable with the change? Why?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

SOLLUTION:-

I believe the tolerance given is misprinted. It should be 100 +/- 1 (i.e. 99 to 101) and not 100 +/ 10 .

The calculation follows:

Process Mean (μ) Sigma (σ) USL LSL Prob(> USL) i.e. % rework Prob( < LSL) i.e. % scrap Rework per day Scrap per day Defect-free parts per day
1 100 5 101 99 42.07% 42.07% 105185 105185 39630
2 105 5 101 99 78.81% 11.51% 197036 28767 24196
3 100 1 101 99 15.87% 15.87% 39664 39664 170672
4 100 0.1 101 99 0.00% 0.00% 0 0 250000
Process Profit from defect-free parts Profit from reworked parts Loss from scrap Net profit
1 $396,299 $978,221 $10,097,767 ($8,723,247)
2 $241,964 $1,832,436 $2,761,672 ($687,272)
3 $1,706,724 $368,873 $3,807,726 ($1,732,129)
4 $2,500,000 $0 $0 $2,500,000

P A D G 1 Rework per day Scrap per day Defect-free Prob( <LSL) ie. % scrap Mean (u) Sigma (a) USL LSL Prob(> USL)ie. % rework

Process First time capable % Rework % Scrap % % between 99-101 (i.e. rework + first-time ok) Profit
1 15.9% 42.07% 42.07% 57.93% ($8,723,247)
2 9.7% 78.81% 11.51% 88.49% ($687,272)
3 68.3% 15.87% 15.87% 84.13% ($1,732,129)
4 100.0% 0.00% 0.00% 100.00% $2,500,000
Add a comment
Know the answer?
Add Answer to:
Non-Conforming Parts (NCP) Presume; Production makes 250,000 Parts per year. Each Part Sells for $100. If no issues, Eac...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT