E11.22 LO11.5 Straightforward calculation of overhead variances: manufacturer The data below relate to Sporty Ltd, a manufact
0 0
Add a comment Improve this question Transcribed image text
Answer #1

1 2 3 Variable overhead spending variance Variable overhead efficiency variance Fixed Overhead Budget Variance Fixed Overhead

Where = SR is the standard variable overhead rate SH are the Standard Machine hours AH are the actual machine hours $ 27.00 1

Add a comment
Know the answer?
Add Answer to:
can you please help with question E11.22 E11.22 LO11.5 Straightforward calculation of overhead variances: manufactur...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • RT 3 INFORMATION FOR MANAGING RESOURCES E11.22 Straightforward calculation of overhead variances: manufacturer LO5] of August...

    RT 3 INFORMATION FOR MANAGING RESOURCES E11.22 Straightforward calculation of overhead variances: manufacturer LO5] of August The data below relate to Super Flash Ltd, a manufacturer of exercise equipment, for the Standard variable overhead rate Standard quantity of machine hours Budgeted fixed overhead Budgeted output $9 per machine hour 4 hours per unit of output $180000 15000 units Actual results for August are as follows: Actual output Actual variable overhead Actual fixed overhead Actual machine time 13500 units $607 500...

  • Exercise 11-22 Straightforward Computation of Overhead Variances (LO 11-5) Crystal Glassware Company has the following standards...

    Exercise 11-22 Straightforward Computation of Overhead Variances (LO 11-5) Crystal Glassware Company has the following standards and flexible-budget data.       Standard variable-overhead rate $ 7.00 per direct-labor hour Standard quantity of direct labor 3 hours per unit of output Budgeted fixed overhead $ 114,000 Budgeted output 19,000 units    Actual results for April are as follows:       Actual output 12,000 units Actual variable overhead $ 324,000 Actual fixed overhead $ 107,000 Actual direct labor 45,000 hours Required: Use...

  • uyur Styles E10.24: Straightforward calculation of variances; variance diagrams: manufacturer Can the Can Ltd manufactures recyclable...

    uyur Styles E10.24: Straightforward calculation of variances; variance diagrams: manufacturer Can the Can Ltd manufactures recyclable soft drink cans. A unit of production is a box of 12 cans. The following standards have been set by the production engineering staff and the factory accountant: Direct material Direct labour Quantity: 4 kilograms Quantity: 0.25 hour Price: $0.90 per kilogram Rate: $33 per hour Actual material purchases amounted to 240 000 kilograms at $0.93 per kilogram. Actual costs incurred in the production...

  • Fresh, Inc., is a manufacturer of vacuums and uses standard costing, Manufacturing overhead (both variable and...

    Fresh, Inc., is a manufacturer of vacuums and uses standard costing, Manufacturing overhead (both variable and fixed) is allocated to products on the basis of budgeted machine-hours. In 2017, budgeted fixed manufacturing overhead cost was $18,000,000. Budgeted variable manufacturing overhead was $10 per machine-hour. The denominator level was 1,000,000 machine-hours. Read the requirements Requirement 1. Prepare a graph for fixed manufacturing overhead. The graph should display how Fresh, Inc.'s fixed manufacturing overhead costs will be depicted for the purposes of...

  • Standard machine hours per unit of output 4 hours Standard variable-overhead rate per machine hour 8.00...

    Standard machine hours per unit of output 4 hours Standard variable-overhead rate per machine hour 8.00 Actual variable-overhead rate per machine hour Actual machine hours per unit of output Budgeted fixed overhead |Actual fixed overhead Budgeted production in units Actual production in units Variable-overhead spending variance Variable-overhead efficiency variance Fixed-overhead budget variance Fixed-overhead volume variance Total actual overhead Total budgeted overhead (flexible budget) Total budgeted overhead (static budget) Total applied overhead 9.00 3 S 50,000 25,000 24,000 72,000 Unfavorable 192,000...

  • Prepare an analysis of all variable manufacturing overhead and fixed manufacturing overhead​ variances, using the​ 4-variance...

    Prepare an analysis of all variable manufacturing overhead and fixed manufacturing overhead​ variances, using the​ 4-variance analysis. 2. Prepare journal entries using the​ 4-variance analysis. 3. Describe how individual fixed manufacturing overhead items are controlled from day to day. 4. Discuss possible causes of the fixed manufacturing overhead variances. The MartinezMartinez Company uses standard costing in its manufacturing plant for auto parts. The standard cost of a particular auto​ part, based on a denominator level of 4,500 output units per​...

  • Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates...

    Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates from the current annual budget. The budget is based on an expected annual output of 123,000 units requiring 492,000 direct labor hours. (Practical capacity is 512,000 hours.) Annual budgeted overhead costs total $811,800, of which $585,480 is fixed overhead. A total of 119,500 units using 490,000 direct labor hours were produced during the year. Actual variable overhead costs for the year were $260,700, and...

  • Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates...

    Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates from the current annual budget. The budget is based on an expected annual output of 129,000 units requiring 516,000 direct labor hours. (Practical capacity is 536,000 hours.) Annual budgeted overhead costs total $861,720, of which $608,880 is fixed overhead. A total of 119,000 units using 514,000 direct labor hours were produced during the year. Actual variable overhead costs for the year were $260,100, and...

  • Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates...

    Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates from the current annual budget. The budget is based on an expected annual output of 126,000 units requiring 504,000 direct labor hours. (Practical capacity is 524,000 hours.) Annual budgeted overhead costs total $826,560, of which $599,760 is fixed overhead. A total of 119,400 units using 502,000 direct labor hours were produced during the year. Actual variable overhead costs for the year were $260,100, and...

  • Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates...

    Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates from the current annual budget. The budget is based on an expected annual output of 124,000 units requiring 496,000 direct labor hours. (Practical capacity is 516,000 hours.) Annual budgeted overhead costs total $828,320, of which $590,240 is fixed overhead. A total of 119,200 units using 494,000 direct labor hours were produced during the year. Actual variable overhead costs for the year were $261,300, and...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT