A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant II needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine theybuy, while plant II gives similar $15 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shippingcosts? What is the minimum cost?
a.) How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints?
The number of engines to send to plant I is ____.
The number of engines to send to plant II is ____.
b.) What is the minimum shipping cost, subject to the given constraints?
what is the minimum shipping cost, subject to the given constraints?
A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least...
A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant II needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It costs $35 per engine to ship to plant I and $50 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant II gives similar $...
A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant II needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It costs $35 per engine to ship to plant I and $50 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant II gives similar $15...
Introduction to linear programming (b) The Miers Company produces small engines for several manufacturers. The company receives orders from two assembly plants for their Top-flight en- gine. Plant I needs at least 45 engines, and plant II needs at least 32 engines. The company can send at most 120 engines to these two assembly plants. It costs S 30 per engine to ship to plant I, and S 40 per engine to ship to 7 plant II. Plant I give...
An auto manufacturer sends cars from its two plants, Plant I and Plant II, to two delearships, dealership A and delearship B. Plant I ships 85 cars to the delearships and Plant II ships 70 cars. Dealership A needs 53 cars and dealership B needs 102 cars. The cost for shipping a car from Plant I to dealerships A and B is $310 and $220, respectively. The cost for shipping a car from Plant II to dealerships A and B...
Jones company has two manufacturing plants A and B, and three warehouses, W1, W2, W3. Each week Jones ships product from the plants to the warehouses. The system is balanced: A produces 500 units of product and B produces 300 units of product. Warehouse W1 needs 200 units of product, W2 needs 300 units of product, and W3 needs 300 units of product. Thus, over the entire system, there are 800 units produced by the two plants and 800 units...
A company that manufactures compressors has plants in three locations: Cleveland, Chicago, and Boston. During a week, the total capacity of each plant to produce one type of special compressor is 25, 45, and 35 units, respectively. The company wants to ship at least 40, 10, 20 and 30 units to distribution centers in Dallas, Atlanta, San Francisco, and Philadelphia respectively. The unit production and distribution costs from each plant to each distribution center are given in the table below....
2. A company that manufactures compressors has plants in three locations: Cleveland, Chicago, and Boston. During a week, the total capacity of each plant to produce one type of special compressor is 25, 45, and 35 units, respectively. The company wants to ship at least 40, 10, 20 and 30 units to distribution centers in Dallas, Atlanta, San Francisco, and Philadelphia respectively. The unit production and distribution costs from each plant to each distribution center are given in the table...
Transhipment Nodes Let index plants, index markets ai supply at plant i bj demand at market j cij per unit cost of shipping from plant i to market i xij amount to ship between plant i and market j Then Minimize zij cij xij Such that i xij ai for all i i xijbj for all j plus non-negativity Let South Dakota S, Denver -D , New Jersey -N, California-C, Florida-F Minimize 2.5 SN+1.7 SC+ 1,8 SF + 2.5 DN+...
ABC soft drink manufacturing company produces soda bottles at three plants: Orlando, Tampa, and Miami. They ship them to major distribution centers in Charlotte. Birmingham, and Tallahassee. The accounting, production, and marketing departments have provided the information in the table below, which shows the unit cost of shipping between any plant and distribution center, plant capacities over the next planning period, and distribution center demands. ABC's supply chain manager faces the problem of determining how much to ship between each...
ABC soft drink manufacturing company produces soda bottles at three plants: Orlando, Tampa, and Miami. They ship them to major distribution centers in Charlotte. Birmingham, and Tallahassee. The accounting, production, and marketing departments have provided the information in the table below, which shows the unit cost of shipping between any plant and distribution center, plant capacities over the next planning period, and distribution center demands. ABC's supply chain manager faces the problem of determining how much to ship between each...