Facility Location Problem Karen Fowler owns the Rockey Mountain Coolers, a semiprofessional basketball 1. team in...
Facility Location Problem Karen Fowler owns the Rockey Mountain Coolers, a semiprofessional basketball 1. team in Northern Colorado. She wishes to move the Coolers east to either Atlanta or Charlotte. The table below gives the factors that Karen thinks are important, their weights, and the scores for Atlanta and Charlotte. Which site should she select in this example? Weight Chatlotte Factor Incentive Atlanta 0.4 80 60 Player Satisfaction Sports Interest Size of city 0.3 0.2 20 40 50 90 0.1 70 30 The fixed and variable costs for two potential plant sites for a ski equipment 2. manufacturer are computed as follows: Cost Victoria S1,000,000 $73/unit Perth $800,000 $112/unit Fixed Variable Graph the total-cost lines for the two potential sites Over what range is each city preferable? If expected volume of the ski equipment is 5,000 units, which site would you recommened? 3. The following table gives the map coordinates and the shipping loads for a set of cities that we wish to connect through a central "hub". Near which map coordinates should the hub be located? Shipping Load Map Coordinates (x. y) (5, 10) (6, 8) City A 5 10 15 C (4, 9) (9, 5) (7, 9) (3, 2) (2, 6) 5 15 E 10 5
Facility Location Problem Karen Fowler owns the Rockey Mountain Coolers, a semiprofessional basketball 1. team in Northern Colorado. She wishes to move the Coolers east to either Atlanta or Charlotte. The table below gives the factors that Karen thinks are important, their weights, and the scores for Atlanta and Charlotte. Which site should she select in this example? Weight Chatlotte Factor Incentive Atlanta 0.4 80 60 Player Satisfaction Sports Interest Size of city 0.3 0.2 20 40 50 90 0.1 70 30 The fixed and variable costs for two potential plant sites for a ski equipment 2. manufacturer are computed as follows: Cost Victoria S1,000,000 $73/unit Perth $800,000 $112/unit Fixed Variable Graph the total-cost lines for the two potential sites Over what range is each city preferable? If expected volume of the ski equipment is 5,000 units, which site would you recommened? 3. The following table gives the map coordinates and the shipping loads for a set of cities that we wish to connect through a central "hub". Near which map coordinates should the hub be located? Shipping Load Map Coordinates (x. y) (5, 10) (6, 8) City A 5 10 15 C (4, 9) (9, 5) (7, 9) (3, 2) (2, 6) 5 15 E 10 5