Question

A toll booth on a turnpike is open from 8:00 AM until midnight. Vehicles start arriving...

A toll booth on a turnpike is open from 8:00 AM until midnight. Vehicles start arriving at 7:45 AM at a uniform rate of 6 veh/min. At 8:15 AM the rate drops to 2 veh/min. If vehicles are processed at a uniform rate of 6 veh/min, determine when the queue will end, the total delay, the maximum queue length, and the longest vehicle delay

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A toll booth on a turnpike is open from 8:00 AM until midnight. Vehicles start arriving...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Suppose vehicles arrive at a single toll booth according to a Poisson process with a mean...

    Suppose vehicles arrive at a single toll booth according to a Poisson process with a mean arrival rate of 8.4 veh/min. Their service times are exponentially distributed. The mean processing rate is 10 veh/min. a. What is the value of the utilization ratio? b. What is the average length of the queue? c. What is the average waiting time in the queue? d. What is the average time spent in the system?

  • Please someone I really could use some help with this problem! 5.43 Vehicles arrive at a...

    Please someone I really could use some help with this problem! 5.43 Vehicles arrive at a toll both starting at 7:00 A.M. at a rate of 1(t) = 5.1 – 0.05t [with (t) in veh/min and t in minutes after 7:00 A.M.]. The first operator processes cars at a rate of 3 veh/minute 7:00 A.M. until 7:15 A.M when the person leaves because of illness. From 7:15 A.M to 7:25 A.M, no one is at the toll booth but a...

  • 6- At the beginning of an effective red, vehicles are arriving at an approach at the...

    6- At the beginning of an effective red, vehicles are arriving at an approach at the rate of 600 veh/h and 18 vehicles are left in the queue from the previous cycle (at the end of the previous cycle’s effective green). However, due to the end of a major sporting event, the arrival rate is continuously increasing at a constant rate of 150 veh/h/min (after 1 minute the arrival rate will be 750 veh/h, after 2 minutes 900 veh/h, etc.)....

  • QUESTION 26 At an entrance to a toll bridge, four toll booths are open. Vehicles arrive...

    QUESTION 26 At an entrance to a toll bridge, four toll booths are open. Vehicles arrive at the bridge at an average rate of 900 veh/h, and at the booths, drivers take an average of 12 seconds to pay their tolls. Both the arrival and departure headways can be assumed to be exponentially distributed How would the average queue length change if a fifth toll booth were opened? a. The average queue length is reduced by 1.17 vehicles D.The average...

  • Problem 4 (25 points) Vehicles begin to arrive at a parking lot at 7:45 A.M. at...

    Problem 4 (25 points) Vehicles begin to arrive at a parking lot at 7:45 A.M. at a constant rate of 4 veh/min and continue to arrive at that rate throughout the day. The parking lot opens at 8:00 A.M. and vehicles are processed at a constant rate of 1 vehicle every 10 seconds. Assuming D/D/1 queuing, answer the following questions: a) Draw the D/D/1 queueing diagram (cumulative number of vehicles vs. time). (5 pts) b) What is size of the...

  • Problem 2 (20 points) Vehicles begin to arrive at a parking lot after the start of arriving at a ...

    Problem 2 (20 points) Vehicles begin to arrive at a parking lot after the start of arriving at a deterministic but time t is in minutes]. A single parking lot attendant processes vehicles (assigns will back up onto fees) at a deterministic rate at the station. A queue exceeding four congested street, and is to be avoided. a major sporting event. They are 3.3-0.1t [where A(t) is in veh/ min and varying rate A(t) vehicles will back up onto a...

  • Commercial trucks begin to arrive at a seaport entry plaza at 7:50a.m., at the rate of 0) 6.3-0.2...

    5.39 commercial trucks begin this question from Principles of Highway Engineering and Traffic Analysis book 5th Commercial trucks begin to arrive at a seaport entry plaza at 7:50a.m., at the rate of 0) 6.3-0.25t truck/min, with t in minutes. The plaza opens at 8:00a.m. For the first 10 minutes, one proce the queue clears, two processing booths are open. Each booth processes trucks at a uniform rate of 2 trucks per minute. What is the average delay per vehicle, the...

  • answer the question number 3 as stated in the picture 2. Vehicles arrive at an entrance...

    answer the question number 3 as stated in the picture 2. Vehicles arrive at an entrance to a recreational park. There is a single gate at which all vehicles must stop), where a park attendant distributes a free brochure. The park opens at 08:00 am, at which time vehicles begin to arrive at a rate of 480 veh/hr. after 20 minutes the arrival flow rate declines at 120 veh/hr, and it continues at that level for the remainder of the...

  • Dizzy Amusement Park is open from 8:00 am till midnight every day of the year. Dizzy...

    Dizzy Amusement Park is open from 8:00 am till midnight every day of the year. Dizzy charges its patrons a daily entrance fee of $30 per person which gives them unlimited access to all of the park's 35 rides. For liability insurance, Dizzy pays a set monthly fee plus a small additional amount for every patron entering the park. The cost of liability insurance would best be described as a Multiple Choice fooed cost mixed cost step variable cost true...

  • Art 250 Choose the best answer of both hands at the same time is A. flow process chart simultaneo...

    art 250 Choose the best answer of both hands at the same time is A. flow process chart simultaneous-motion (SIMO) chart 2 The best chart used to analyze the Body is called B. Operations charts D. None of the above 3. In a stopwatch time study, the average time it takes a given worker to perform a task a certain number of times is the: A. Observed time B. Normal time C. Standard time D. Performance rating time Labor Standards...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT