Question

Southern Environmenta I Consulting (SEC), Inc. designs plans and specifications for asbestos abatement (removal) projects in

esigns plans estos has be ntractors fe her continu ongress, SE ent buildings. Cu Xlectron microsc ontractor and th y. Becaus

Help in section B please

Southern Environmenta I Consulting (SEC), Inc. designs plans and specifications for asbestos abatement (removal) projects in public, private, and government buildings Currently, SEC must conduct an air test before allowing the occupancy i a udiding The ony pcos in thie evstom are the oosts of shinpina the air-test samples to the subcontractor e and the labor involved in shipping the samples. With the growth of the business consider either continuing subcontract the TEM analysis to outside companies developing its own TEM MARR SEC mus laboratory. Because of the passage of the Asbestos Hazard known Emergency Response Act (AHERA) by the U.S. Congress, SEC expects about 1,000 air-sample tests per year over eight years. The firm's to be 15 %. EEB Click the icon to view the description of alternatives Click the icon to view the interes t factors r discrete compounding when MARR 15% per year . (a) Determine the cost of an air-sample test by the TEM laboratory (in-house). The unit cost $ 188.62 (Round t the nearest cent.) (b) What is the required number of air samples per year to make the two options equivalent? The break-even number of air samples is (Round to the nearest whole number.)
esigns plans estos has be ntractor's fe her continu ongress, SE ent buildings. Cu Xlectron microsc ontractor and th y. Because of t to be 15%. More Info Subcontract option. The client is charged $400 per sample, which is $100 above the subcontracting fee of $300. Labor expenses are $1,500 per year, and shipping expenses are estimated to be $0.50 per sample. TEM purchase option. The purchase and installation cost for the TEM is $415,000. The equipment would last for eight years, at which time it would have no salvage value. The design and renovation cost is estimated to be $9,500 and it is paid only once along with the installation cost. The client is charged $300 per sample based on the current market price. One full-time manager and two part-time technicians are needed to operate the laboratory. Their combined annual salaries will be $50,000. Material required to operate the lab includes carbon rods copper grids, filter equipm estimated at $6,000 per year. Utility costs, operating and maintenance costs, and the indirect labor needed to maintain the lab are estimated at $18,000 per year. atives. iscrete com TEM labora ent.) year to ma and acetone. The costs of these materials are und to the n The extra income-tax expenses would be $20,000. Print Done elick Check Clear All (?
0 0
Add a comment Improve this question Transcribed image text
Answer #1

b. Break Even Number

Total Cost of 1000 Samples = 1000 *188.62 = $188620

Lets says X is break even number

Sale Price under Sub Contract - (Sub Contract Fee + Sample Fee + (Labor Expenses/X)) = Sale Price under TEM - (Total Cost / X)

400 - (300 + 0.50 + (1500/X)) = 300 - (188620 / X)

Solve for X

(1500/X) + 188620 / X = 200.55

200.55 * X = 190120

X = 948 Air Samples Break Even Samples

Add a comment
Know the answer?
Add Answer to:
Help in section B please Southern Environmenta I Consulting (SEC), Inc. designs plans and specifications for...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • BREAK EVEN ANALYSIS Southern Environmental Consulting​ (SEC), Inc. designs plans and specifications for asbestos abatement​ (removal) projects in​ public,...

    BREAK EVEN ANALYSIS Southern Environmental Consulting​ (SEC), Inc. designs plans and specifications for asbestos abatement​ (removal) projects in​ public, private, and government buildings.​ Currently, SEC must conduct an air test before allowing the occupancy of a building after the asbestos has been removed. SEC subcontracts​ air-test samples to a laboratory for analysis by transmission electron microscopy​ (TEM). To offset the cost of TEM​ analysis, SEC charges its clients $100 more than the​ subcontractor's fee. The only expenses in this system are the costs of shipping the​ air-test samples to...

  • Question Help Southem Env allowing SEC charges its clients the growth of the business, Emergency lConsulting...

    Question Help Southem Env allowing SEC charges its clients the growth of the business, Emergency lConsulting (SEC), Inc. designs plans and specifications for asbestos abatement (removal) projects in public, private, and government buildings. Currently, SEC omenta t before the occu $100 more than the subcontractor's emoved SEC subcontracts air-test samples to a laboratory for analysis by transmission electron microscopy (TEM) To offeot the onst of TEM r and the labor involved in shipping the samples. With SEC must consider either...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT