Ans:
1. What is the company’s plant wide overhead rate? (Round your answer to 2 decimal places.) (Per DHL) |
||
Total Overheads |
664,200 |
|
Total Direct Labour hours |
10000 |
|
plant wide overhead rate |
$66.42 Per DLH |
Total Overheads=$221100+$107100+$85,000+$251,000=$664,200
Total Direct labour Hours=10,000 Given.
Plant wide Overhead rate=Total Overheads/Total Direct labour hours
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7000 units of Product...
Required information Greenwood Company manufactures two products -15,000 units of Product Y and 7000 units of Product uses a plantwide overhead rate based on direct labor-hours. It is considering implementin UASRC I system that allocates all of its manufacturing overhead to four cost pools. The followirig g an activity-based costing information is available for the company as a whole and for Products Y and Z Estimated Overhead Act tivity Cost Pool Activity MeasureCost Expected ActivitY Machining Machine setups Production design...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Estimated Overhead Cost s 221,100 Expected ActivitY Activity Cost Pool Machining Machine setups Production...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and z Estimated Overhead Cost s 221,100 s 107, 100 85,000 Activity Cost Pool Expected ivity...
Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...
Hickory Company manufactures two products--15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and 2. (The total estimated overhead cost may not agree with the sum of allocated overhead costs to...
Required information Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Cost Expected Activity 12,000 MHs 130 setups 2 products 15,000 DLHS Activity...
Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...
Hickory Company manufactures two products—15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: (The total estimated overhead cost may not agree with the sum of allocated overhead costs to...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Estimated Overhead Expected Activity 11,000 MHs Activity Cost Pool Machining Machine setups Production design...