CONCEPT
: Error calculation in speed and distance problem
Kindly give rating
using the new values below, what is the speed ot the marble as it passes through...
Using the new values below, what is the speed of the marble as it passes through the photogate? Give your answer in cm/s. (Hint: This is a simple calculation.) t 0.022 0.002 s d-2.54 0.02 cm Your Answer cm/s Answer units Question 5 (2 points) Saved To answer this question refer to the document Uncertainty Analysis Explained. Using the new values below, what is the percent uncertainty in the speed of the marble as it passes through the photogate? Round...
Answer units Question 6 (1 point) Using the new values below, what is the absolute uncertainty in the speed of the marble as it passes through the photogate? (Hint: Just like you calculated in previous problem you will need to find the percent uncertainty for the speed. Then use that to find the absolute uncertainty.) t 0.021 0.003 s d = 2.54 ± 0.03 cm Your Answer: Answer units
cm/s Answer units Question 6 (1 point) Saved Using the new values below, what is the absolute uncertainty in the speed of the marble as it passes through the photogate? (Hint: Just like you calculated in previous problem you will need to find the percent uncertainty for the speed. Then use that to find the absolute uncertainty.) t-0.024土0.003 s d 2.54 0.03 cm Your Answer: cm/s Answer units Submit Qulz 6 of 6 questions save 曲姇
Page 2 of 4 Question 2 (1 point) A marble rolls through a photogate located at the edge of a table and blocks the photogate for an average time of t-0.013-o.003 s. The diameter of the marble is d -2.53+0.01 cm. What is the speed of the marble in the vertical direction as it leaves the table? Give your answer in m/s. Your Answer: Answer units Next Page Page 2 of 4 Submit Qulz 0 of A questions saved
Page 1 of 4 Question 1 (1 point) A marble rolls through a photogate located at the edge of a table and blocks the photogate for an average time of t-0.016±0.009 s. The diameter of the marble is d # 2.50±0.01 cm. What is the speed of the marble in the horizontal direction as it leaves the table? Give your answer in m/s. Your Answer: Answer units Next Page Page 1 of 4 Page Submit Quizoof 4 questions saved
"Extra 2.6.07 (Multistep) Use the exact values you enter to make later calculations. Push down, Relaxed ; length release from rest A spring has a relaxed length of 29 cm (0.29 m) and its spring stiffness is 6 N/m. You glue a 76 gram block (0.076 kg) to the top of the spring, and push the block down, compressing the spring so its total length is 16 cm. You make sure the block is at rest, then at time t...
Determine the Capacitance in uF (micro-Farads) of the system
below using the data, graph and tolerance graph below.
R -ww G(s) 1/(RCs+1) ei R =1000 ohms 1 Slope T c(t) c() = 1 - e-(1/T B 0.632 Tolerance graph (Ts(2%) = 4*T): A A 4T 2T 3T 5T 63.2% 86.5% 95% 98.2% Of output 99.3% 0.75 0.5 Output curve: 0.25 0 0 0.025 0.05 0.075 0.1 0.125 Data: x(time) y(amplitude) 0.001 0.09516258196 0.002 0.1812692469 0.2591817793 0.003 0.329679954 0.004 0.3934693403 0.005...
Water at 50 °Fis circulated from a large tank, through a filter, and back to the tank Calculate the volumetric flow rate through the filter for the following given information: Patm V.. Valve Pump Filter Pump power: W=200 lbf.ft/s Pump efficiency: 1p-0.9 Total pipe length: /= 200 ft Pipe diameter: d=0.1 ft Pipe surface relative roughness: /d=0.01 Elbow loss factor (each): Kelbow=1.5 Valve loss factor: Kvalve-6 Inlet and Exit type: sudden, Fig. 6.22 Filter loss factor Kriter=12 F (velocity, ft/s...
Tries for critical value: 5.3177, 1.86, 4.8205
A straight line is fitted to some data using least squares. Summary statistics are below. n=10, 7=5,5=12, SSxx=142, SSxy=128, SSyy=155 The least squares intercept and slope are 7.50 and 0.90, respectively, and the ANOVA table is below. Source DF SSMS Regression 1 115.38 115.38 Residual 8 39.62 4.95 Total 9 155 What is the estimated mean value for y when x=10? 16.5000 (2 pt(s)] You are correct. Your receipt no. is 155-2037 Previous...
DataPoint Engineering is considering the purchase of a new piece of equipment for $360,000. It has an eight year midpoint of its asset depreciation range (ADR). It will require an additional initial investment of $180,000 in nondepreciable working capital. Sixty-five thousand dollars of this investment will be recovered after the sixth year and will provide additional cash flow for that year. Income before depreciation and taxes for the next six are shown in the following table. Use Table 12-11. Table...