1 | |||||||
Reduction in labor costs | 105000 | ||||||
Reduction in material waste | 6600 | ||||||
Total | 111600 | ||||||
Less increased maintenance costs | 37200 | ||||||
Annual net cost savings | 74400 | ||||||
2a | |||||||
Now | 1 | 2 | 3 | 4 | 5 | 6 | |
Cost of machine | -265000 | ||||||
Software and installation | -75000 | ||||||
Salvage value of old equipment | 12500 | ||||||
Annual net cost savings | 74400 | 74400 | 74400 | 74400 | 74400 | 74400 | |
Replacement of parts | -38000 | ||||||
Salvage value of new machine | 21000 | ||||||
Total cash flows | -327500 | 74400 | 74400 | 36400 | 74400 | 74400 | 95400 |
Discount factor (19%) | 1 | 0.840 | 0.706 | 0.593 | 0.499 | 0.419 | 0.352 |
Present value | -327500 | 62496 | 52526 | 21585 | 37126 | 31174 | 33581 |
Net present value | -89012 | ||||||
2b | |||||||
NO, as Net Present value is negative | |||||||
3 | |||||||
Negative Net present value to offset | 89012 | ||||||
Divide by PV factor | 3.410 | =(1-(1.19)^-6)/0.19 | |||||
Minimum dollar value of intangible benefits | 26103 | or 26111 |
"I'm not sure we should lay out $265,000 for that automated welding machine," said Jim Alder,...
Find the area of the shaded region. The graph depicts the standard normal distribution with mean 0 and standard deviation 1 Click to view.page 1 of the table. Click to view.page 2 of the table The area of the shaded region is (Round to four decimal places as needed) Standard Normal Distribution Area 0 Z N .01 3.4 - 3.3 -3.2 3.1 3.0 2.9 2.8 - 2.7 .09 .0002 .0003 .0005 .0007 .0010 .0014 .0019 .0026 .08 ,0003 .0004 .0005...
“I’m not sure we should lay out $305,000 for that automated welding machine,” said Jim Alder, president of the Superior Equipment Company. “That’s a lot of money, and it would cost us $85,000 for software and installation, and another $49,200 per year just to maintain the thing. In addition, the manufacturer admits it would cost $48,000 more at the end of three years to replace worn-out parts.” “I admit it’s a lot of money,” said Franci Rogers, the controller. “But...
I'm not sure we should lay out $280,000 for that automated welding machine." said Jim Alder, president of the Superior Equipment Company. "That's a lot of money, and it would cost us $80,000 for software and installation, and another $43,200 per year just to maintain the thing. In addition, the manufacturer admits it would cost $43,000 more at the end of three years to replace worn out parts. admit it's a lot of money." said Franci Rogers, the controller. "But...
"I'm not sure we should lay out $285,000 for that automated welding machine," said Jim Alder, president of the Superior Equipment Company. “That's a lot of money, and it would cost us $81,000 for software and installation, and another $44,400 per year just to maintain the thing. In addition, the manufacturer admits it would cost $44,000 more at the end of three years to replace worn-out parts." "I admit it's a lot of money," said Franci Rogers, the controller. "But...
“I’m not sure we should lay out $365,000 for that automated welding machine,” said Jim Alder, president of the Superior Equipment Company. “That’s a lot of money, and it would cost us $97,000 for software and installation, and another $5,300 every month just to maintain the thing. In addition, the manufacturer admits that it would cost $60,000 more at the end of three years to replace worn-out parts.” “I admit it’s a lot of money,” said Franci Rogers, the...
“I’m not sure we should lay out $375,000 for that automated welding machine,” said Jim Alder, president of the Superior Equipment Company. “That’s a lot of money, and it would cost us $99,000 for software and installation, and another $5,500 every month just to maintain the thing. In addition, the manufacturer admits that it would cost $62,000 more at the end of three years to replace worn-out parts.” “I admit it’s a lot of money,” said Franci Rogers, the...
“I’m not sure we should lay out $365,000 for that automated welding machine,” said Jim Alder, president of the Superior Equipment Company. “That’s a lot of money, and it would cost us $97,000 for software and installation, and another $5,300 every month just to maintain the thing. In addition, the manufacturer admits that it would cost $60,000 more at the end of three years to replace worn-out parts.” “I admit it’s a lot of money,” said Franci Rogers, the...
A standardized exam's scores are normally distributed In a recent year, the mean test score was 1495 and the standard deviation was 315. The test scores of four students selected at random are 1900, 1240, 2230, and 1400 Find the z-scores that correspond to each value and determine whether any of the values are unusual The z-score for 1900 is (Round to two decimal places as needed) The Z-score for 1240 is (Round to two decimal places as needed.) The...
Find the area of the shaded region. The graph depicts the standard normal distribution with mean 0 and standard deviation 1 Click to view.page 1 of the table. Click to view.rage 2 of the table. 2036 The area of the shaded region is (Round to four decimal places as needed.) edge - Google Chrome -nt/Player Test.aspx?testid=215354477¢erwin-yes mer 2020 jevon rutledge & 3: Chapters 5, 6, & 7 Time Remaining 21 of 32 (7 complete) Th 0 Standard Normal Distribution Table...
8 The height of women ages 20-29 is normally distributed, with a mean of 642 inches. Assume o = 27 inches. Are you more likely to randomly select 1 woman with a height less than 65.4 inches or are you more likely to select a sample of 15 women with a mean height less than 65.4 inches? Explain. Click the icon to view page 1 of the standard normal table B Click the icon to view page 2 of the...