Question

Req. 5: Use the estimated labor time requirement to schedule production of Job 114 , including the start and end dates. Assume the plant will already be operating at full capacity every day while completing Jobs 111, 112, and 113. Also assume that only 4 direct laborers with the needed skill set will be available for this job. These hourly employees are only allowed to work a maximum of 8 hours per day so that the company can avoid paying overtime premiums.

use Req 1-4 to answer req 5-7C D E 1 Req 2: First, fill in the missing costs. Then, calculate the companys predetermined manufacturing 2 overhead rate, a1 Req. 3: The production engineers have given you the materials requirements for each Black & White 2 handbag. Assume that noA B C 1 Req. 4: The production engineers have also given you the production labor requirements for each individual 2 bag prod1 Req. 5: Use the estimated labor time requirement to schedule production of Job 114, including the start 2 and end dates. As


1 0
Add a comment Improve this question Transcribed image text
✔ Recommended Answer
Answer #1

Requirement 5

Total hours require for job 114 for 44 unit production is 62.7

Estimated Labour Job 114
number of unit 44
Activity Time per bag (in minutes) Total Estimated Time (in minutes)
Cutting 30 330
Sewing 70 3080
Ironing 8 352
Total minutes require for job 114 3762
Total hours require for job 114 62.7

Total hours skilled work force available per day : 32 (4*8)

Number of days require for production 8 days

Scheduled start date 10/10 Scheduled End date 10/18

Requirement 6 indirect material use while making hand bag

1 Glue

2 Thread

Requirement 7 production equipment will be needed for production

1 Scissor

2 self healing mats

3 metal punch

4 pliers

5 eyelets

Add a comment
Know the answer?
Add Answer to:
Req. 5: Use the estimated labor time requirement to schedule production of Job 114
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • Please use the above info to answer the next problems B C D 1 Due to...

    Please use the above info to answer the next problems B C D 1 Due to its popularity, the Black and White Handbag (BW14293) is normally a stock item. However, the 2 handbag is currently out of stock. Rather than producing only enough units to fill Katie's order, 3 management would like to produce a job (Job 114) that is large enough to fill Katie's order and replenish 4 stock. The fabric used for this job can be stacked four...

  • Data Analysis Project Part 1 Custom Fabric Ventures is a small company that produces fabric-based wardrobe...

    Data Analysis Project Part 1Custom Fabric Ventures is a small company that produces fabric-based wardrobe accessories (such as, handbags, scarves, and headbands) and home accessories (such as placemats, pillows, and window treatments).   The company keeps a limited number of popular items in stock, but primarily produces custom orders. Customers are able to choose from a wide selection of styles, sizes, and fabrics for each type of product. Most of the company’s customers are small boutiques, home décor shops, and home-decorators...

  • Scholastic Brass Corporation manufactures brass musical instruments for use by high school students. The company uses...

    Scholastic Brass Corporation manufactures brass musical instruments for use by high school students. The company uses a normal costing system, in which manufacturing overhead is applied on the basis of direct-labor hours. The company’s budget for the current year included the following predictions. Budgeted total manufacturing overhead ..........................................................................................................$426,300 Budgeted total direct-labor hours (based on practical capacity) .....................................................................20,300 During March, the firm worked on the following two production jobs: Job number T81, consisting of 76 trombones Job number C40, consisting of...

  • Comprehensive Income Tax Course: Module 1 4. Randy turned 16 last year and had his first...

    Comprehensive Income Tax Course: Module 1 4. Randy turned 16 last year and had his first summer job. Even though his parents are claiming him as a dependent he wants to file a return in order to get his refund. He receives his W-2 and decides he can do his own return using form 1040-EZ. Which of the following information is not found on a Form W-2? a) The taxpayer’s Social Security number b) The taxpayer’s wages, tips and other...

  • Code is in C# Your instructor would like to thank to Marty Stepp and Hélène Martin...

    Code is in C# Your instructor would like to thank to Marty Stepp and Hélène Martin at the University of Washington, Seattle, who originally wrote this assignment (for their CSE 142, in Java) This program focuses on classes and objects. Turn in two files named Birthday.cs and Date.cs. You will also need the support file Date.dll; it is contained in the starter project for this assignment. The assignment has two parts: a client program that uses Date objects, and a...

  • A. Issues [1] In addition to damages for one year's notice period, can a trial judge...

    A. Issues [1] In addition to damages for one year's notice period, can a trial judge award significant damages for the mere fact of an employee's dismissal, or for the stigma that that dismissal brings? Or for the employer thereafter competing with the ex-employee for the clients, before the ex-employee has got a new job? B. Basic Facts [2] This is an appeal from 2009 ABQB 591 (CanLII), 473 A.R. 254. [3] Usually a judgment recites facts before law. But...

  • Summary should briefly analyze the central problems and issues of the case and provide some analysis...

    Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...

  • CASE 1-5 Financial Statement Ratio Computation Refer to Campbell Soup Company's financial Campbell Soup statements in...

    CASE 1-5 Financial Statement Ratio Computation Refer to Campbell Soup Company's financial Campbell Soup statements in Appendix A. Required: Compute the following ratios for Year 11. Liquidity ratios: Asset utilization ratios:* a. Current ratio n. Cash turnover b. Acid-test ratio 0. Accounts receivable turnover c. Days to sell inventory p. Inventory turnover d. Collection period 4. Working capital turnover Capital structure and solvency ratios: 1. Fixed assets turnover e. Total debt to total equity s. Total assets turnover f. Long-term...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT