Question

Mastery Problem: Activity-Based Costing (Advanced) Activity-Based Costing Traditionally, Overhead cost: Sometimes referred to as "factory overhead,"...

Mastery Problem: Activity-Based Costing (Advanced)

Activity-Based Costing

Traditionally, Overhead cost: Sometimes referred to as "factory overhead," this is an indirect cost that is not directly tied to the production of units, yet nonetheless must be built into product cost in order to appropriately price it. Examples are managerial salaries, rent expense, setup costs, and property taxes.overhead costs are assigned based arbitrarily on the rate of either Direct labor: This is a labor cost directly associated with the production of goods and services. An example is the hourly wages of workers.direct labor or Direct materials: This is a material cost directly associated with the production of goods. An example is sheet metal used to manufacture auto parts.direct materials associated with production. This makes sense when companies only make a few products, production processes are simple, and overhead costs are less pervasive. However, today production processes are more complex, companies make a wider array of products, and fewer costs are directly traceable to units of production. To address this, companies use activity-based costing (ABC).

Specifically, activity-based costing identifies and traces costs and expenses to activities and then to specific products. ABC uses multiple factory overhead rates based on activities. Activities are the types of work, or actions, involved in a manufacturing process or service activity. For example, assembly, inspection, and engineering design are activities.

The estimated activity costs are allocated to products using an activity rate. Activity rates are determined as follows:
Activity Rate = Estimated Activity Cost / Estimated Activity Base Usage

Illustrated Example of Activity-Based Costing

Comparing Two Products under Traditional and Activity-Based Costing

Compare two projects under development by the same company. The following are a few aspects of each product’s development process relevant to costs.

Product S Product T
Requires 3,200 hours of testing Requires 800 hours of testing
Requires 4,200 units of computing power Requires 1,800 units of computing power
Requires 30 developer hours to implement Requires 70 developer hours to implement
Cost Items Cost of Each Activity
Testing: $31,200
Computing power: $46,800
Developer hourly cost: $10 per hour

Traditional Costing

Traditional costing would take the proportion of a direct cost, such as direct labor hours, and use it as the basis for allocating overhead costs, such as computing power and testing. In the following table, use developer hours as the basis for assigning overhead costs (computing and developer costs) to each project. If required, round your answers to the nearest dollar.

Product S Product T
Percentage of developer hours 30% Percentage of developer hours 70%
Testing cost $ Testing cost $
Computing cost $ Computing cost $
Developer cost $ Developer cost $
Total cost $ Total cost $
Percentage of developer hours

+ Percentage of developer hours for Product S (30%)

Allocation basis for Product S: The amount of labor hours associated directly with Product S, as a percentage of all developer hours worked (regardless of product). The amounts for overhead to be allocated are multiplied by this value to determine the overhead to be assigned to Product S under the traditional costing method.
30
(30+70)

+ Percentage of developer hours for Product T (70%)

Allocation basis for Product T: The amount of labor hours associated directly with Product T, as a percentage of all developer hours worked (regardless of product). The amounts for overhead to be allocated are multiplied by this value to determine the overhead to be assigned to Product T under the traditional costing method.
70
(30+70)

Review the resources each product (S and T) requires for production and compare that to the costs calculated above under traditional costing. Does traditional costing serve as an accurate gauge of costs?

  • Yes
  • No
  • Not enough information

Feedback

Activity-Based Costing

Using the data above for products S and T, calculate the costs using activity-based costing. Allocate the costs of testing, computing, and development based on the rates of activity consumed by each product's development process. If required in your computations, round per unit costs to the nearest cent. Round your final answers to the nearest dollar.

Cost Activity Base
Testing Hours of testing
Computing cost Units of computing power
Developer cost Development hours
Product S Product T
Testing cost $ Testing cost $
Computing cost $ Computing cost $
Developer cost $ Developer cost $
Total cost $ Total cost $

Feedback

Activity-based costing for varying batch production

A manufacturing company has the following two activities associated with completion of products:

  1. The setting up of machines for running batches of products
  2. The actual production of units produced

The company has annual manufacturing overhead costs of $2,000,000, of which $200,000 is directly involved in setting up machines for batch runs. During the year, the company expects to perform 400 machine setups, one setup per batch for a total of 400 batches of production. Assume that the batch sizes vary considerably, but the work involved in setting up the machines is not appreciably different from one job to the next.

If the company estimates that the $200,000 costs associated with setups will yield 400 setups this year, the cost associated directly with each setup will be $ per setup. Because each job will require its own setup, setup costs are viewed as batch costs. Because $200,000 of the $2,000,000 are costs associated with setups, this means that costs associated directly with the production of units equal $.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Ans:1) Cost as per the Absorption Costing

Particulars Cost of each activity Number of Activity Cost Product S (30% of Development Hours) Product T (70% of Development Hours)
Testing cost $31,200 4000 $124,800,000 $37,440,000 $87,360,000
Computing cost $46,800 6000 $280,800,000 $84,240,000 $196,560,000
$10 100 $1,000 $300 $700
Total Cost Product Basis $121,680,300 $283,920,700

2) Activity Based Costing

Particulars Cost of each activity Product S   Product T  
Number of Activity Cost Number of Activity Cost
Testing cost $31,200 3200 $99,840,000 800 $24,960,000
Computing cost $46,800 4200 $196,560,000 1800 $84,240,000
Developer cost $10 30 $300 70 $700
Total Cost Product Basis $296,400,300 $109,200,700

Under the Traditional costing system the cost of production of product S is lower than the product T, whereas in Activity based Costing System the cost of production is of product S is higher than the product T this is due to in activity based costing system cost is allocated on the basis of different activity performed for production of each product.

3) The company has annual manufacturing overhead costs of $2,000,000, of which $200,000 is directly involved in setting up machines for batch runs.During the year, 400 machine setups, one setup per batch for a total of 400 batches of production. Manufacturing Overheads of $200,000 costs associated with setups will yield 400 setups this year, the cost associated directly with each setup will be $500 per setup. Because $200,000 of the $2,000,000 are costs associated with setups, this doesn't means that costs associated directly with the production of units. As this incurred on the basis of production of Batches. If this cost is allocated on the basis of per unit then the result will be different if production is not took place in batch.

Add a comment
Know the answer?
Add Answer to:
Mastery Problem: Activity-Based Costing (Advanced) Activity-Based Costing Traditionally, Overhead cost: Sometimes referred to as "factory overhead,"...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • I need help figuring out part two Week 1 CNOW Assignment Calculator Comparing Two Products under...

    I need help figuring out part two Week 1 CNOW Assignment Calculator Comparing Two Products under Traditional and Activity-Based Costing Compare two projects under development by the same company. The following are a few aspects of each product's development process relevant to costs. Products Requires 3,200 hours of testing Product T Requires 800 hours of testing Requires 2,100 units of computing power Requires 4,900 units of computing power Requires 25 developer hours to implement Requires 75 developer hours to implement...

  • Exercise 2A-3 Activity-Based Absorption Costing as an Alternative to Traditional Product Costing [LO2-5] Stillicum Corporation makes...

    Exercise 2A-3 Activity-Based Absorption Costing as an Alternative to Traditional Product Costing [LO2-5] Stillicum Corporation makes ultra light-weight backpacking tents. Data concerning the company's two product lines appear below: 10 points Deluxe Standard unit Dieet maeerials per s 26.00 Direct labor-hours per unit Estimated annual production 0.70 DLHS 1.40 DLHS 10,000 units units 50,000 eBook The company has a traditional costing system in which manufacturing overhead is applied to units based on direct labor-hours. Data concerning manufacturing overhead and direct...

  • Activity Cost Pool Activity Measure Estimated Overhead $ Purchasing Number of Orders $12,000.00 Material Handling Number...

    Activity Cost Pool Activity Measure Estimated Overhead $ Purchasing Number of Orders $12,000.00 Material Handling Number of Receipts $15,000.00 Production orders Set-up Hours $20,250.00 Inspection Inspection Hours $16,000.00 Frame assembly Assembly Hours $8,000.00 Machine related Machine Hours $30,000.00 Total Manufacturing Overhead costs $101,250.00. To complete an "activity-based" cost structure, you are required to apply manufacturing overhead to each of the briefcase products on the activity cost pool data provided. Note that the Activity Cost Pools are determined by management and...

  • Pro blem 2 (Supplemental Problem #2)-Activity-based costing versus traditional costing sunglasses. The company uses a normal...

    Pro blem 2 (Supplemental Problem #2)-Activity-based costing versus traditional costing sunglasses. The company uses a normal cos based on direct labor hours Lovelace Company produces only two products: reading glasses and sung system and overhead costs are currently allocated using a plant-wide overhead rate products. Itants have recommended that the company use activity-based costing to charge overhead to he company expects to produce 4,000 reading glasses and 8,000 sunglasses this year. Each pair of reading glasses requires two direct labor...

  • Problem 2 (Supplemental Problem #2) – Activity-based costing versus traditional costing Lovelace Company produces only two...

    Problem 2 (Supplemental Problem #2) – Activity-based costing versus traditional costing Lovelace Company produces only two products: reading glasses and sunglasses. The company uses a normal cost system and overhead costs are currently allocated using a plant-wide overhead rate based on direct labor hours. Outside cost consultants have recommended that the company use activity-based costing to charge overhead to products. The company expects to produce 4,000 reading glasses and 8,000 sunglasses this year. Each pair of reading glasses requires two...

  • Owlet distractors inc. uses activity-based costing to determine product costs. Activity rates computed at the beginning...

    Owlet distractors inc. uses activity-based costing to determine product costs. Activity rates computed at the beginning of the year are used to apply manufacturing overhead costs to products. The following data concerning its activity-based costing system has been provided. Estimated overhead and activity rates, at the beginning of the year were: Estimated Expected Activity cost pools Overhead cost Activity Machine related (Machine hours) $431,200 16,000 MHs Batch setup (setups) $661,500 21,000 setups General factory (direct labor-hours) $612,150 26,500 DLHs The...

  • Traditional costing system allocate overhead based on a standard unit-based measure that ll products have in...

    Traditional costing system allocate overhead based on a standard unit-based measure that ll products have in common machine hours, processing time or direct labor hours but these allocation measures assume all overhead cost are directly related to units produced. Company uses a standard allocation method for overhead of 400% of direct labor costs. to produce 100000 units of product A requires $35000 of direct material and $80000 of direct labor costs. To produce 3000 units of product B requires $12000...

  • Exercise 2A-3 Activity-Based Absorption Costing as an Alternative to Traditional Product Costing (LO2- 5) Stillicum Corporation...

    Exercise 2A-3 Activity-Based Absorption Costing as an Alternative to Traditional Product Costing (LO2- 5) Stillicum Corporation makes ultra light-weight backpacking tents. Data concerning the company's two product lines appear below: Direct materials per unit Direct labor per unit Direct labor-hours per unit Estimated annual production $ 56.00 $ 14.00 0.70 DLHS 10,000 units Standard $ 44.00 $ 11.60 1.40 DLHS 50,000 units The company has a traditional costing system in which manufacturing overhead is applied to units based on direct...

  • c. assigns activity cost pools to products and services, then allocates overhead back to the activity...

    c. assigns activity cost pools to products and services, then allocates overhead back to the activity cost pools. d. allocates overhead directly to products and services based on activity levels e. none of these answers are correct. 21. Which of the following has the weakest linkage between activity and cost driver? Activity Machine setup Machine maintenance Lighting on shop floor Quality control Manual cloth making Cost Driver Number of setups Book value of machines Number of kilowatt-bours Square feet of...

  • A Melbourne-based company Acacia is considering the adoption of an activity-based costing (ABC) system because they...

    A Melbourne-based company Acacia is considering the adoption of an activity-based costing (ABC) system because they suspect that their traditional costing system distorts the product costs. Acacia produces and sells two products A and B. Their traditional costing system uses direct labor hours as the allocation base for manufacturing overhead cost. Additional information: Product A Product B Direct materials (DM) $38 per unit $28 per unit Direct labor (DL) $24 per unit $12 per unit Units produced 50,000 units 200,000...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT