Question

CALCULATOR PRINTER VERSION BACK NEXT Problem 17-3A (Part Level Submission) Shaker Stairs Co. designs and builds factory-made
Inventory control (raw materials and finished goods) Utilities Number of components Square feet occupied 168,000 90,000 Steve
Your answer is correct. Compute the predetermined overhead rate using traditional costing with machine hours as the basis. (R
CALCULATOR PRINTER VERSION BA Your answer is correct. alculate activity-based overhead rate for each activity. (Round answers
Attempts: 2 of 3 used (c2) Caluclate total overhead assigned under ABC. Total overhead assigned Click if you would like to Sh
0 0
Add a comment Improve this question Transcribed image text
Answer #1

a. Predetermined overhead rate

In this example, Predetermined overhead rate is calculated based on machine hours.

Predetermined overhead rate = Budgeted total overhead/Budgeted machine hours

Predetermined overhead rate = 1,056,330/100,000 = $10.56 per hour

b. Manufacturing cost per stairway under traditional cosing

We have to first calculate total cost of 250 stairways. For this, we need to allocate the overheads based on machine hour rate calculated above.

Particulars Amount ($) 104,400 112,700 Direct materials Direct labour Manufacturing overheads (15,300 machine hours*$10.56 pe

(c1) Activity based overhead rate

To calculate the activity based overhead rate, we need to divide the total cost of the activity pools by the estimated use of cost drivers.

Overhead cost pools Purchasing Handling materials Production Setting up machine Inspecting Inventory control Utilities Total(c2) Total overheads assigned under ABC

To calculate total overheads assigned under ABC, we need to multiply the activity usage for 250 stairways of each activity pool by the activity overhead rate calculated in (c1) above.

Overhead cost pools Purchasing Handling materials Production Setting up machine Inspecting Inventory control Utilities Total

Add a comment
Know the answer?
Add Answer to:
CALCULATOR PRINTER VERSION BACK NEXT Problem 17-3A (Part Level Submission) Shaker Stairs Co. designs and builds...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Problem 4-3A a-b, c1-c3 (Video) (Part Level Submission) Shaker Stairs Co. designs and builds factory-made premium...

    Problem 4-3A a-b, c1-c3 (Video) (Part Level Submission) Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2020 are as follows. Overhead Cost Pools Amount Purchasing Handling materials Production (cutting, milling, finishing) Setting up machines Inspecting Inventory control (raw materials and finished goods) Utilities Total budgeted...

  • Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components...

    Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2020 are as follows. Overhead Cost Pools Purchasing Handling materials Production (cutting, milling, finishing) Setting up machines Inspecting Inventory control (raw materials and finished goods) Utilities Total budgeted overhead costs Amount $75,000 82,000 220,000 100,000 120,000 126,000...

  • Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components...

    Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2020 are as follows. Amount Overhead Cost Pools Purchasing Handling materials Production (cutting, milling, finishing) Setting up machines Inspecting Inventory control (raw materials and finished goods) Utilities $75,000 82,000 210,000 100,000 96,000 126,000 270,000 Total budgeted overhead...

  • Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components...

    Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2020 are as follows. Overhead Cost Pools Amount Purchasing $75,000 Handling materials 82,000 Production (cutting, milling, finishing) 220,000 Setting up machines 105,000 Inspecting 114,000 Inventory control (raw materials and finished goods) 126,000 Utilities 360,000 Total budgeted overhead...

  • using P4-3A Shaker Stairs Co. designs and builds factory-made premium wooden stai ABC omes. The manufactured...

    using P4-3A Shaker Stairs Co. designs and builds factory-made premium wooden stai ABC omes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2017 are as follows. Overhead Cost Pools Purchasing Handling materials Production (cutting, milling, finishing) Setting up machines Inspecting Inventory control (raw materials and finished goods) Utilities Total budgeted overhead costs Amount $ 75,000 82,000 210,000...

  • P17-3A--- Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway...

    P17-3A--- Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2017 are as follows. Overhead Cost Pools Amount Purchasing $ 75,000 Handling materials 82,000 Production (cutting, milling, finishing) 210,000 Setting up machines 105,000 Inspecting 90,000 Inventory control (raw materials and finished goods) 126,000 Utilities 180,000 Total...

  • Problem 17-03A a-b, c-c (Part Level Submission) Shaker Stars Co, designs and builds factory made premium...

    Problem 17-03A a-b, c-c (Part Level Submission) Shaker Stars Co, designs and builds factory made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, handrais permit installation of starways of varying lengths and widths. All are of white oak wood Budgeted manufacturing overhead costs for the year 2020 are as follows. Overhead Cost Pools Purchaung Handing materials Production (cutting, milling, finishing) Setting up machines Inspecting Inventory control (raw materials and finished goods) Utaties Total budgeted overhead costs...

  • Shaker Stairs Co.designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles,...

    Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2020 are as follows.Overhead Cost PoolsAmountPurchasing$75,000Handling materials82,000Production (cutting, milling, finishing)210,000Setting up machines100,000Inspecting96,000Inventory control (raw materials and finished goods)126,000Utilities450,000Total budgeted overhead costs$1,139,000For the last 4 years, Shaker Stairs Co. has been charging overhead to products on the basis...

  • Shaker Stairs Co.designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles,...

    Shaker Stairs Co.designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2020 are as follows. Overhead Cost Pools Purchasing Handling materials Production (cutting, milling, finishing) Setting up machines Inspecting Inventory control (raw materials and finished goods) Utilities Total budgeted overhead costs Amount $75,000 82,000 220,000 105,000 108,000 126,000 270,000...

  • Problem 5-39A (Part Level Submission) Stellar Stairs Co. designs and builds factory-made premium wooden stairs for...

    Problem 5-39A (Part Level Submission) Stellar Stairs Co. designs and builds factory-made premium wooden stairs for homes. The manufactured stair components (spindles, risers, hangers, hand rails) permit installation of stairs of varying lengths and widths. All are made of white oak wood. The company’s budgeted manufacturing overhead costs for 2016 are as follows: Overhead Cost Pools Amount Purchasing $69,000 Handling materials 82,000 Production (cutting, milling, finishing) 210,000 Setting up machines 95,000 Inspecting 90,000 Inventory control (raw materials and finished goods)...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT