The total cost of George held in work in progress for the month ending May is as follows:
Direct Material 1,100
Direct Labour 800
FOH (0.80 of DL) 640
Total cost 2,540
What is the total amount left in the Work in Process account at the end of...
Cost of a Manufactured Product-Job Costing System Ross Poldark is a contractor specializing in custom-built Jacuzzis. As of May 1, 2018, Poldark has incurred the following costs for each of the jobs listed below. Poldark uses the Job Order Cost system. ENYS CARNE TRURO 2,100 $ 1,850 $ 800 DL 1,900 1,600 660 FOH 1,520 1,280 528 TOTAL $ 5,520 $ 4,730 $ 1,988 DM During May, Poldark incurs the following costs below. Poldark begins one job during the month...
Cost of a Manufactured Product-Job Costing System Ross Poldark is a contractor specializing in custom-built Jacuzzis. As of May 1, 2018, Poldark has incurred the following costs for each of the jobs listed below. Poldark uses the Job Order Cost system. ENYS CARNE TRURO DM $ 2,100 $ 1,850 $ 800 DI 1,900 1,600 660 FOH 1,520 1,280 528 TOTAL $ 5,520 $ 4,730 $ 1,988 During May, Poldark incurs the following costs below. Poldark begins one job during the...
Cost of a Manufactured Product- Job Costing System Ross Poldark is a contractor specializing in custom-built Jacuzzis. As of May 1, 2018, Poldark has incurred the following costs for each of the jobs listed below. Poldark uses the Job Order Cost system. DM DL FOH TOTAL ENYS 2,500 2,000 1,200 5,700 CARNE TRURO $ 2,000 $ 900 1,200 800 720 480 $ 3,920 $ 2,180 $ During May, Poldark incurs the following costs below. Poldark begins one job during the...
Cost of a Manufactured Product - Job Costing System 1) During may, Poldark incurs the following costs below. Poldark begins on job during the month of may and completes the other three during the course of the month. Factory overhead is charged to the jobs on the basis of $.60 per dollar of direct labor hours. 2) Determine the total costs of each completed jobs in the space below. 3) What is the total amount left in the Work in...
Cost of a Manufactured Product- Job Costing System Robert Perez is a contractor specializing in custom-built Jacuzzis. Perez uses the Job Order Cost system. As of May 1, 2018, Perez has incurred the following costs for each of the jobs listed below HERMAN ALTON STINER $ 900 DM s 2,000 DMS 2500 DI. 800 DL 1,200 DL 2,000 560 FOH 840 FOH 1,400 FOH TOTAL: 2,260 TOTAL: $ 4,040 TOTAL:$ 5,900 During May, Perez incurs the following costs below. Perez...
3. calculate the ending balances of work in process and finished goods as of June 30. A. WIP: B, FG: 4. calculate cost of goods sold for June. 4.5 At the beginning of June, Galway Company had two jobs in process, Job 78 and Job 79, with the following accumulated cost information: Job 79 Direct materials Direct labor Applied overhead Balance, June 1 Job 78 $1,000 600 750 $2,350 $ 800 1,000 1.250 $3,050 During June, two more jobs (80...