a) it should be in series
with value b) 375.28 micro Farad
c) it should be connected in series to have lower capacitance
value , 292.502 micro Farad
please rate it up thanks :)
According to its design specification, the timer circuit delaying the closing of an elevator door is...
According to its design specification, the timer circuit
delaying the closing of an elevator door is to have a capacitance
of 25.0 µF between two points A and B. When one
circuit is being constructed, the inexpensive but durable capacitor
installed between these two points is found to have capacitance
28.6 µF. To meet the specification, one additional capacitor can be
placed between the two points.
According to its design specification, the timer circuit delaying the closing of an elevator...
1. Are the two capacitors shown in the circuit in series, or in
parallel?
a)Parallel
b) Series
2. Calculate the equivalent capacitance between points A and B
for the circuit shown. All the capacitors are 17 μF each. Give your
answer in μF.
3. In an R-C circuit the resistance is 171 Ω and Capacitance is
40 μF, what will be the time constant? Give your answer in
milliseconds.
4. The time constant of an RC circuit is the time...
summarizr the followung info and write them in your own words and break them into different key points. 6.5 Metering Chamber: 6.5.1 The minimum size of the metering box is governed by the metering area required to obtain a representative test area for the specimen (see 7.2) and for maintenance of reasonable test accuracy. For example, for specimens incorporating air spaces or stud spaces, the metering area shall span an integral number of spaces (see 5.5). The depth of...
summatize the following info and break them into differeng key points. write them in yojr own words
apartus
6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...