Question

Under process costing, which manufacturing costs are assigned to the product as it moves from one...

Under process costing, which manufacturing costs are assigned to the product as it moves from one manufacturing process to the next?
a. Direct materials, direct labor, and conversion costs
b. Direct materials, indirect materials, and manufacturing overhead
c. Direct materials, direct labor, and manufacturing overhead
d. Direct materials, direct labor, and indirect labor

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Solution:

Direct materials, direct labor, and manufacturing overhead costs are assigned to the product as it moves from one manufacturing process to the next.

Hence option c is correct.

Add a comment
Know the answer?
Add Answer to:
Under process costing, which manufacturing costs are assigned to the product as it moves from one...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Explanation not necessary Under absorption costing, a unit of product includes which costs? A. direct material, dir...

    Explanation not necessary Under absorption costing, a unit of product includes which costs? A. direct material, direct labor, and fixed manufacturing overhead B. direct material, direct labor, and variable manufacturing overhead C. direct material, direct labor, and all variable manufacturing overhead D. direct material, direct labor, and manufacturing overhead During production, how are the costs in process costing accumulated? A to cost of goods sold B. to each individual department C. to each individual product D. to manufacturing overhead In...

  • Which of the following best describes costs assigned to the product under the variable costing method?

    MC Qu. 79 Which of the following best describes costs...Which of the following best describes costs assigned to the product under the variable costing method?Direct labor (DL)Direct materials (DM)Variable selling and administrative (VSA)Variable manufacturing overhead (VOH)Fixed selling and administrative (FSA)Fixed manufacturing overhead (FOH)

  • Under full absorption costing, which of the following are included in product costs? A. Only conversion...

    Under full absorption costing, which of the following are included in product costs? A. Only conversion costs. B. Only variable manufacturing costs. C. Only direct materials and direct labor. D. All fixed and variable manufacturing costs.

  • Compare and contrast the primary differences between the job costing and process costing using the following​...

    Compare and contrast the primary differences between the job costing and process costing using the following​ table: Select the letter from the list below that corresponds with the characteristic that best explains each item in the table. LOADING... ​(Click the icon to view the list of​ characteristics.) a. Direct materials and conversion costs b. Direct materials and conversion costs are assigned to each manufacturing process. Then these costs are accumulated in separate WIP accountslong dash—one for each manufacturing process. As...

  • Compare and contrast the primary differences between the job costing and process costing using the following...

    Compare and contrast the primary differences between the job costing and process costing using the following table Select the letfer from the list below that corresponds with the characteristic that best explains each item in the table (Click the icon to view the list of characteristics.) Job costing Process costing Characteristics Most suitable manufacturing environment Cost object used for accumulating costs Primary document for tracking costs Manufacturing cost categories Flow of costs through accounts Direct materials and conversion costs Direct...

  • OD QUESTION 16 Under variable costing, a unit of product includes which costs? A. direct material,...

    OD QUESTION 16 Under variable costing, a unit of product includes which costs? A. direct material, direct labor, and manufacturing overhead B. direct material, direct labor, and variable manufacturing overhead C. direct material, direct labor, and fixed manufacturing overhead D. direct material, direct labor, and all variable manufacturing overhead

  • The purpose of this project is to help illustrate the manufacturing process and the costs involved....

    The purpose of this project is to help illustrate the manufacturing process and the costs involved. You will need to locate an example of a manufacturing process –hint try sites such as Google or YouTube. The product you select is completely your choice!    Required          Answer the below questions regarding the manufacturing process for the product you selected. Format your paper according to the question you are answering. Your responses should be in complete sentences and be free of spelling...

  • Which of the following is normally included in product cost under the variable costing method? A)...

    Which of the following is normally included in product cost under the variable costing method? A) Direct materials cost, direct labour cost, but NOT manufacturing overhead cost. Direct materials cost, direct labour cost, and variable manufacturing B) overhead cost. C) Prime cost but NOT conbersion cost. D) Prime cost and all conversion cost.

  • 1. LO 41 Which of the following product situations is better suited to job order costing...

    1. LO 41 Which of the following product situations is better suited to job order costing than to process conting? A Each product batch is exactly the same as the prior batch B. The costs are easily traced to a specific product. C. Costs are accumulated by department D. The value of work in process is based on assigning standard costs. 2. LO 41 A job order costing system is most likely used by which of the following? A. a...

  • Units planned for production Material moves per product line Purchase orders per product line Direct labor...

    Units planned for production Material moves per product line Purchase orders per product line Direct labor hours per product line Mobile Safes 200 300 450 800 Walk-in Safes 50 200 350 1,700 (a) Your answer is correct. The total estimated manufacturing overhead was $276,000. Under traditional costing (which assigns overhead on the basis of direct labor hours), what amount of manufacturing overhead costs are assigned to: (Round answers to 2 decimal places, e.g. 12.25.) (1) One mobile safe $ 441.6...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT